Resource Loaded Schedule Project Master Schedule Master Schedule Legend NCSX Funding Profiles Total Estimated Cost (TEC) and Project Schedule CD-1 to CD-2 Scope Reductions Cost Summary Milestone Table CD2 Rates and Resource Codes Work Breakdown Structure Dictionary Work Breakdown Structure Risk Management Risk Management Plan Preliminary Design and Design Review System Functions and Requirements General Requirements Document Hazards Analysis and E.S.&H. Environmental Evaluation Notification Form Preliminary Hazards Analysis (Rev. 1) Environmental Assessment Finding of No Significant Impact Value Management/Engineering Report of Value Engineering Study Report of Manufacturing Value Engineering Studies Project Controls/Earned Value Management System NCSX Project Control Systems Review, Feb 27-28, 2003 Panel Report Project Execution Plan Project Execution Plan (February 2004) Start-up Test Plan NCSX Test and Evaluation Plan Acquisition Strategy Acquisition Execution Plan NCSX Acquisition Strategy Review Integrated Project Team and Project Staffing Integrated Project Team Staff Training Plan
Project Master Schedule Master Schedule Legend NCSX Funding Profiles
CD-1 to CD-2 Scope Reductions Cost Summary Milestone Table CD2 Rates and Resource Codes
Work Breakdown Structure
Risk Management Plan
General Requirements Document
Environmental Evaluation Notification Form Preliminary Hazards Analysis (Rev. 1) Environmental Assessment Finding of No Significant Impact
Report of Value Engineering Study Report of Manufacturing Value Engineering Studies
NCSX Project Control Systems Review, Feb 27-28, 2003 Panel Report
Project Execution Plan (February 2004)
NCSX Test and Evaluation Plan
Acquisition Execution Plan NCSX Acquisition Strategy Review
Integrated Project Team Staff Training Plan