NCSX PDR Recommendations Disposition Report
NCSX PDR Panel Final Report
WBS 1 Stellarator Core Systems Design Descriptions
WBS 11 & 12 Vacuum Vessel and In-vessel Components
WBS 13 & 15 Conventional Coils and Support Structure
WBS 14 Modular Coils
WBS 17 Cryostat and Base Support Structure
WBS 18 Field Period Assembly Plan
WBS 2 Auxiliary Systems Design Descriptions
WBS 3 Diagnostic System Design Description
WBS 4 Electrical Power System Design Description
WBS 5 Central I&C System Design Description
WBS 6 Facility Systems System Design Descriptons
WBS 7 Final Assembly Plan
Structural Design Criteria
Metrology Needs Assessment
Field Error Source Assessment Notebook
Preliminary Design Drawing Package
(Hardcopy to be provided to Review Committee)