NCSX PDR Baseline Documentation (October - November 2003)

  1. Resource Loaded Schedule

    Project Master Schedule

    Master Schedule Legend


  2. Total Estimated Cost (TEC) and Project Schedule

    Rates and Resource Codes

    Cost Summary by WBS

    Summary Schedule

    BA & BO Profiles

    Milestone Table

    Critical-path Schedule

    Cost and Schedule Documentation


  3. Work Breakdown Structure Dictionary

    Work Breakdown Structure

    WBS 1 Dictionary

    WBS 2 Dictionary

    WBS 3 Dictionary

    WBS 4 Dictionary

    WBS 5 Dictionary

    WBS 6 Dictionary

    WBS 7 Dictionary

    WBS 8 Dictionary


  4. Risk Management

    Risk Management Plan


  5. Preliminary Design and Design Review

    NCSX PDR Recommendations Disposition Report

    NCSX PDR Panel Final Report

    WBS 1 Stellarator Core Systems Design Descriptions

    WBS 11 & 12 Vacuum Vessel and In-vessel Components

    WBS 13 & 15 Conventional Coils and Support Structure

    WBS 14 Modular Coils

    WBS 17 Cryostat and Base Support Structure

    WBS 18 Field Period Assembly Plan

    WBS 2 Auxiliary Systems Design Descriptions

    WBS 3 Diagnostic System Design Description

    WBS 4 Electrical Power System Design Description

    WBS 5 Central I&C System Design Description

    WBS 6 Facility Systems System Design Descriptons

    WBS 7 Final Assembly Plan


    Structural Design Criteria

    Metrology Needs Assessment

    Field Error Source Assessment Notebook

    Preliminary Design Drawing Package
    (Hardcopy to be provided to Review Committee)


  6. System Functions and Requirements

    General Requirements Document


  7. Hazards Analysis and E.S.& H.

    Status Summary: Hazards Analysis

    Environmental Evaluation Notification Form

    Preliminary Hazards Analysis (Rev. 1)

    Environmental Assessment

    Finding of No Significant Impact


  8. Value Management/Engineering

    Report of Value Engineering Study

    Report of Manufacturing Value Engineering Studies


  9. Project Controls/Earned Value Management System

    NCSX Project Control Systems Review, Feb 27-28, 2003

    Panel Report


  10. Project Execution Plan

    Project Execution Plan


  11. Start-up Test Plan

    NCSX Test and Evaluation Plan


  12. Acquisition Strategy

    NCSX Acquisition Strategy Review

    Acquisition Execution Plan


  13. Integrated Project Team and Project Staffing

    Integrated Project Team

    Staff Training Plan


  14. Conceptual Design Review Issues

    CDR Recommendations Disposition Report

    CDR Panel Report June 2002

    Conceptual Design Review May 21-23, 2002


Last update: March 4, 2013
U.S. Department of Energy Logo Princeton University Logo Princeton Plasma Physics Laboratory Logo ORNL Logo Contact Webmaster