Review Title Modular Coil SRD Spec Review
Date 31 March 2004
Cognizant Engineer Dave Williamson
Responsible Line Manager Mike Cole (for Brad Nelson)
Review Board Chairperson Wayne Reiersen
Review Board Members Phil Heitzenroeder, Jim Chrzanowski, Hutch Neilson, Mike Zarnstorff
Invited Attendees Malinowski, Chrzanowski,  Simmons, Viola, Brown, Goranson, Freudenberg
Other Attendees
Charge

1. Are the requirements consistent with the GRD

2. Have all relevant requirements been captured

3. Have evaluation criteria for verification of the requirements been established.

Design Review Material

Announcement

Modular Coil SRD

Chits and Disposition

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified
Development plans and schedules Not addressed
Regulatory compliance including USQD and NEPA Not addressed
Disposition of CHITS from previous reviews Not applicable
Cost objectives Not addressed

Other review objectives addressed

(Attachment 4 of ENG-033)

Not applicable

Summary of Results

The requirements are consistent with the GRD.  Additional work is required to complete SRD as noted in the chits.

Disposition

(check  one)

 1  Acceptable
 1 Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete