NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Design Review > 142
Review Title Modular Coil Type C Cladding FDR
Date 30 June 2005
Cognizant Engineer Dave Williamson
Responsible Line Manager Brad Nelson
Review Board Chairperson Wayne Reiersen
Review Board Members Jim Chrzanowski, Larry Dudek, Phil Heitzenroeder, Art Brooks
Invitees Dave Williamson, Brad Nelson, Wayne Reiersen
Attendees Dave Williamson, Brad Nelson, Jim Chrzanowski, Larry Dudek, Art Brooks, Hutch Neilson, Paul Fogarty, Kevin Freudenberg, Steve Raftopoulos, Greg Pitonak, Ron Strykowsky, H.M Fan, Buddy Kearns, Wayne Reiersen
Charge 1. Is the design of the Type C coil complete?

2. Are the drawings and specifications required to support Type C procurements complete and ready to be signed pending resolution of chits?

3. Is the schedule for completing remaining design documentation achievable and consistent with project need dates?

The design of the Type C modular coil is defined by the Type C assembly. We have conducted FDRs already for the following procurement/fabrication packages:

1. MCWF (5/19/04)

2. Type C cladding (4/27/05)

3. Type C upper and lower lead blocks (6/3/05)

This FDR will provide a review of the balance of the lead block design, chill plates, production clamps, and winding assembly.
Design Review Material

Announcement

Presentation (Williamson)

Presentation (Fogarty)

Design Review Report

Chits and Disposition Plan

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules  
Regulatory compliance including USQD and NEPA    
Disposition of CHITS from previous reviews    
Cost objectives    

Other review objectives addressed

(Attachment 4 of ENG-033)

 

Summary of Results

Disposition

(check  one)

 1  Acceptable
 1 Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 1Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete

Privacy and Security Notice