Engineering > Design Review > WBS 124
Review Title Vacuum Vessel Manned Access Port and Lateral Support FDR
Date 17 November 2005
Cognizant Engineer Paul Goranson
Responsible Line Manager Wayne Reiersen
Review Board Chairperson Brad Nelson
Review Board Members Fred Dahlgren, Mike Viola, Mike Kalish, Mike Cole, Geoff Gettelfinger, Larry Dudek
Invitees Hutch Neilson, Phil Heitzenroeder, Jim Chrzanowski, H. M. Fan, Kevin Freudenberg, Mike Zarnstorff
Attendees Wayne Reiersen, Jerry Levine, Paul Goranson, Kevin Freudenberg, Brad Nelson, Mike Cole, Jeff Makiel, Larry Dudek, Fred Dahlgren, Phil Heitzenroeder, HM Fan, Tom Brown, Mike Kalish, Geoff Gettelfinger
Charge 1. Is the design of the VV lateral support system adequate for normal, fault, and handling loads, including upgraded first wall and a full complement of diagnostics?

2. Do the supports have adequate capability and adjustment to facilitate field period assembly, final assembly, and motion during cool-down and bake-out?

3. Is the personnel access port adequate for initial operation and maintenance?

4. Are the interfaces with other systems (primarily the mod coil shell and cryostat) adequately defined?

5. Are the analyses complete and documented, including stress in the port assembly and heat leak to the mod coils?

6. Are the design drawings adequate for procurement?
Design Review Material

Announcement

Presentation

Chits and Disposition

Review Board Report

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules  
Regulatory compliance including USQD and NEPA    
Disposition of CHITS from previous reviews    
Cost objectives    

Other review objectives addressed

(Attachment 4 of ENG-033)

 

Summary of Results

 

Disposition

(check  one)

 1  Acceptable
 1 Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete