Review
Title |
Vacuum Vessel Manned Access
Port and Lateral Support FDR |
Date |
17 November 2005 |
Cognizant
Engineer |
Paul Goranson |
Responsible Line Manager |
Wayne Reiersen |
Review Board Chairperson |
Brad Nelson |
Review Board Members |
Fred Dahlgren, Mike Viola,
Mike Kalish, Mike Cole, Geoff Gettelfinger, Larry Dudek |
Invitees |
Hutch Neilson, Phil
Heitzenroeder, Jim Chrzanowski, H. M. Fan, Kevin Freudenberg, Mike
Zarnstorff |
Attendees |
Wayne Reiersen, Jerry
Levine, Paul Goranson, Kevin Freudenberg, Brad Nelson, Mike Cole, Jeff
Makiel, Larry Dudek, Fred Dahlgren, Phil Heitzenroeder, HM Fan, Tom
Brown, Mike Kalish, Geoff Gettelfinger |
Charge |
1. Is the design of the VV
lateral support system adequate for normal, fault, and handling
loads, including upgraded first wall and a full complement of
diagnostics?
2. Do the supports have adequate capability and adjustment to
facilitate field period assembly, final assembly, and motion during
cool-down and bake-out?
3. Is the personnel access port adequate for initial operation and
maintenance?
4. Are the interfaces with other systems (primarily the mod coil
shell and cryostat) adequately defined?
5. Are the analyses complete and documented, including stress in the
port assembly and heat leak to the mod coils?
6. Are the design drawings adequate for procurement? |
Design Review Material |
Announcement
Presentation
Chits and Disposition
Review Board Report
|
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
|
Regulatory compliance including USQD and NEPA |
|
|
|
Disposition of CHITS from previous reviews |
|
|
|
Cost
objectives |
|
|
|
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
|
Disposition
(check
one) |
1 Acceptable |
1
Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
1 Incomplete -
Additional design
work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |