Engineering > Design Review > WBS 142
Review Title Fiber Optic Strain Gages and Coil Testing Peer Review
Date 18 August 2006
Cognizant Engineer Dave Williamson
Responsible Line Manager Brad Nelson
Review Board Chairperson Wayne Reiersen
Review Board Members Charlie Neumeyer, Paul Sichta, Raki Ramakrishnan, Irving Zatz, Art Brooks
Invitees Wayne Reiersen, Brad Nelson, Kevin Freudenberg, Geoff Gettelfinger, Hutch Neilson , Paul Sichta
Attendees Wayne Reiersen, Charlie Neumeyer, Greg Pitonak, Hutch Neilson, Geoff Gettelfinger, Raki Ramakrishnan, Paul Sichta, Hans Schneider, Ray Gernhardt, Kevin Freudenberg, Dave Williamson, Jim Tsai, Rich Hawryluk
Charge

·  Is the proposed strain gage instrumentation and data acquisition system a prudent  choice?  Are there alternatives that should have been considered?

·  Are the R&D plans (prior to coil testing) adequate to develop appropriate mounting procedures for glass-epoxy and stainless steel structures and to establish the suitability of the proposed strain gages in a cryogenic, pulsed magnetic field environment when mounted to glass-epoxy and stainless steel structures?  Should other steps be taken?

·  Are the proposed cryostat cooling and LN2 supply system modifications appropriate and adequately planned?

· Do the cost and schedule estimates to complete all the work through testing of the C5 coil appear reasonable?

Design Review Material

Announcement

Chits and Disposition

Presentation 1

Presentation 2

Presentation 3

Review Committee Report

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules
Regulatory compliance including USQD and NEPA    
Disposition of CHITS from previous reviews    
Cost objectives  

Other review objectives addressed

(Attachment 4 of ENG-033)

   

Summary of Results

Disposition

(check  one)

  1 Acceptable
  Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete