Review
Title |
Fiber Optic Strain Gages and
Coil Testing Peer Review |
Date |
18 August 2006 |
Cognizant
Engineer |
Dave Williamson |
Responsible Line Manager |
Brad Nelson |
Review Board Chairperson |
Wayne Reiersen |
Review Board Members |
Charlie Neumeyer, Paul
Sichta, Raki Ramakrishnan, Irving Zatz, Art Brooks |
Invitees |
Wayne Reiersen, Brad Nelson,
Kevin Freudenberg, Geoff Gettelfinger, Hutch Neilson , Paul Sichta |
Attendees |
Wayne Reiersen, Charlie
Neumeyer, Greg Pitonak, Hutch Neilson, Geoff Gettelfinger, Raki
Ramakrishnan, Paul Sichta, Hans Schneider, Ray Gernhardt, Kevin
Freudenberg, Dave Williamson, Jim Tsai, Rich Hawryluk |
Charge |
· Is
the proposed strain gage instrumentation and data acquisition system a
prudent choice? Are there alternatives that should have been
considered?
·
Are the R&D plans (prior to coil testing) adequate to develop
appropriate mounting procedures for glass-epoxy and stainless steel
structures and to establish the suitability of the proposed strain gages
in a cryogenic, pulsed magnetic field environment when mounted to
glass-epoxy and stainless steel structures? Should other steps be
taken?
·
Are the
proposed cryostat cooling and LN2 supply system modifications
appropriate and adequately planned?
· Do
the cost and schedule estimates to complete all the work through testing
of the C5 coil appear reasonable? |
Design Review Material |
Announcement
Chits and Disposition
Presentation 1
Presentation 2
Presentation 3
Review Committee Report
|
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
|
Regulatory compliance including USQD and NEPA |
|
|
|
Disposition of CHITS from previous reviews |
|
|
|
Cost
objectives |
|
|
|
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
|
Disposition
(check
one) |
1 Acceptable |
Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
1 Incomplete -
Additional design
work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |