___________________________ From: Wayne T. Reiersen Sent: Monday, October 23, 2006 10:30 AM To: Thomas G. Brown; Lawrence E. Dudek; Michael E. Viola; mjc@ornl.gov; Horng-Ming Fan; Arthur W. Brooks; Phil Heitzenroeder; John W. Edwards; Steve Raftopoulos; Kevin Freudenberg (freudenbergk@ornl.gov); xdw@ornl.gov; fogartypj@ornl.gov; Geoffrey J. Gettelfinger Cc: Hutch Neilson; Mike Williams; Ronald L. Strykowsky Subject: Station 3 PDR Folks, We would like to conduct a PDR for the Station 3 tooling this Thursday at 3pm. The purpose of the meeting is to: 1. Make sure the requirements for the tooling is well defined (including dimensional control requirements) 2. Make sure we have a design which functionally meets those requirements (including a credible metrology approach) 3. Make sure that the tooling meets structural design criteria 4. Make sure that all chits from the Station 1 tooling have been addressed and relevant chits from the FPA Peer Review have been dispositioned and are being addressed I would like for Viola, Heitzenroeder, Brooks, and Cole to serve with me on the review committee. Brown will organize the presentations. PPPL folks will meet in the Engineering Conference Room. Remote participants can dial in on 866.718.9081 using passcode 706670. Regards, Wayne