Please click on dates underlined in table below to access design review material...

 

WBS

Description

Peer Review or CDR

PDR

FDR

Other

7

Test Cell Prep and Machine Assembly

71

Shield Wall Reconfiguration

3/9/04 
72 Control Room Refurbishment  

73

 Platform Design and Fabrication

  6/15/05
74 Machine Assembly Planning and Oversight
  Final Assembly Plan 4/15/04      
75 Test Cell & Basement Assembly Operations
76 Tooling Design and Fabrication
77 Measurement Systems

 