Testing of the C1 coil was performed on June 15 and 16, 2006.  The test results were summarized by Ray Gernhardt who took the strain gage and thermocouple data from the Coil Test Facility.  Additional data were taken by Hans Schneider (coil resistance data).  Current waveforms archived in NSTX files were provided by Geoff Gettelfinger.  Also included are the results of strain gage tests performed at LN2 temperature prior to installation on C1.

C1 Test Report

Coil Test Facility Pictures (Gettelfinger)

Strain gage test results (Gernhardt)

Sample tests of strain gages at 80K on 5/3/06-5/4/06

Coil Test Facility Data (Gernhardt)

C1 coil test strain gage and thermocouple data collected on  6/15/06 - 6/27/06

Overview of the C1 coil test strain gage and thermocouple data acquisition instrumentation

C1 data files (CSV format - open in Excel)

Coil Resistance Data (Schneider)

Coil resistance during cooldown (measured at warm leads)

Measurements versus predictions

Summary plot of coil resistance for 6/15, 6/16, and 6/23 shots (measured at coil)

Log of coil resistance (measured at coil) and displace-o-meter measurements for 6/15, 6/16, and 6/23 shots

Scope shots of 6/15 shots

Deflect-o-meter Data (Schneider)

DVD from camera focused on digital readout (150MB)

Control Room Data (Gettelfinger)

More to come...ground fault currents, current waveforms, etc.