WBS 12:  Paul Goranson WBS 25:  Henry Kugel  Date of Agreement:   December 17, 2002
Project Engineer (s):  Brad Nelson (WBS 1) & Larry Dudek (Ancillary Systems) Systems Engineer:  Bob Simmons

Type of Interface

Scope

Lead Responsibility

Deliverable

Due Date

WAF Task Reference

Design Studies None.        
Functional Interfaces None.        
Physical Interfaces (1) Attachment scheme and envelopes to accommodate NBI -- port extensions and viewing angles.

WBS 12 (Goranson)

Separate ICD. Needs to be done in time to incorporate into VV design and associated drawings, which have to be reviewed and promoted to Preliminary Design Release Level prior to the PDR.