The purpose of this web page is to provide correlation between NCSX-specific procedures and guidelines relative to existing PPPL policies, manuals, and procedures

NCSX-Specific Procedure and Guidelines

Corresponding PPPL Policy, Manual, or Procedure

  NCSX Modification

NCSX-PROC-001, Glossary

ENG-029, Technical Definitions and Acronyms

Augments ENG-029 to include NCSX specific terms and acronyms

NCSX-PROC-002, Configuration Control

NONE

 

NCSX-PROC-003, Interface Control

NONE

 

NCSX-PROC-004, NCSX Work Authorization Processes

ENG-033, Design Verification

 

ENG-032, Work Planning

 

Augments Attachment 4, Objectives of and Documentation of Design Reviews of ENG-033

 

Implements ENG-032 in its entirety, but puts in context of how NCSX project will use ENG-032

NCSX-PROC-005, Electronic Signatures

NONE

 

NCSX-PROC-006, Control of NCSX Supplier Information

NONE

 

NCSX-PROC-007, Release, Approval, and Revision of ProE/INTRALINK Fabrication Drawings

ENG-010, Control of Drawings, Software, and Firmware

Augments ENG-010 to add CAD systems processes

NCSX Engineering Web Page, Style Instructions and Sample Document

 

ENG-006, Preparation, Review and Approval of Specifications & Statements of Work ENG-006 only provides suggested guidelines and format.  These style guidelines and sample document establish and demonstrate the format requirements for the NCSX Project.

NCSX Engineering Web Page, Procurement Guide

PPPL Procurement Policies and Procedures Manual and Associated PPPL Procurement Procedures (36.XXX) Provides one-stop shopping links to appropriate PPPL procurement practices and requirements
NCSX Engineering Web Page, SOW Guidelines ENG-006, Preparation, Review and Approval of Specifications & Statements of Work ENG-006 only provides suggested guidelines and format.  These SOW guidelines establish the SOW content and format requirements for the NCSX Project.
NCSX Engineering Web Page, Spec Guidelines ENG-006, Preparation, Review and Approval of Specifications & Statements of Work ENG-006 only provides suggested guidelines and format.  These spec guidelines establish the SOW content and format requirements for the NCSX Project.
NCSX Engineering Web Page, Design Review Guidelines ENG-033, Design Verification

Amplifies requirements of ENG-033 to clarify:

  • Defines Job Manager as the cognizant individual

  • Clarifies what is needed in the "Charge"
  • Clarifies that the charge and design documentation should be forwarded to the Design Review Board and NCSX Engineering Manager (or designee) at least one (1) week prior to review
  • Requires completed CHIT forms to be forwarded to the NCSX Engineering Administrator vs. the Ops Center => NCSX has an electronic CHIT database