WBS
|
Description
|
Development
Specs
|
Product
Specs
|
Spec Reviews
|
18 |
Field Period
Assembly |
|
|
|
|
Photogrammetry |
|
NCSX-PRL-18-001 |
|
185 |
Field Period
Assembly Operations |
|
|
|
|
Station 1 Field Period Assy (S1-FPA) |
|
NCSX-CSPEC-185-01-03 |
|
|
Station 2 Field Period Assy (S2-FPA) |
|
NCSX-CSPEC-185-02-00 |
|
|
Station 3 Field Period Assy (S3-FPA) |
|
NCSX-CSPEC-185-03-00 |
|
|
Station 5 Field Period Assy (S5-FPA) |
|
|
|
186 |
Tooling
Design and Fabrication |
|
|
|
|
Modular Coil
Assembly Fixture |
|
NCSX-CSPEC-186-01-00-dA |
Spec
Cancelled - Other option selected (3 pt Lift) |
|
|
|
|
|
Notes:
[1]
The document governing Field Period Assembly activities is the Field
Period Assembly Plan. Development specs are only planned for Tooling and
Measurement Systems.
[2]
Not required as part of MIE Project
|