NCSX-CSPEC-185-03_Station3_FPA\NCSX-CSPEC-185-03-00.pdf

NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Specifications > WBS 18 Specifications

Legend

 

 

No spec planned

ID

Drafted

ID

Approved

[Note]

See note below table

Please click on document identifier underlined in table below to access the spec...

 

WBS

Description

Development Specs

Product Specs

Spec Reviews

18 Field Period Assembly      
Photogrammetry   NCSX-PRL-18-001  
185 Field Period Assembly Operations      
Station 1 Field Period Assy (S1-FPA)   NCSX-CSPEC-185-01-03  
Station 2 Field Period Assy (S2-FPA)   NCSX-CSPEC-185-02-00  
Station 3 Field Period Assy (S3-FPA)   NCSX-CSPEC-185-03-00  
Station 5 Field Period Assy (S5-FPA)  
186 Tooling Design and Fabrication      
  Modular Coil Assembly Fixture   NCSX-CSPEC-186-01-00-dA Spec Cancelled - Other option selected (3 pt Lift)
         

Notes:

[1] The document governing Field Period Assembly activities is the Field Period Assembly Plan. Development specs are only planned for Tooling and Measurement Systems.

[2] Not required as part of MIE Project