| ARIES-CS Project Meeting - October 4-5, 2006 | ||
| October 5, ARIES CS Review Meeting |
| ARIES CS Project Meeting | ||
|
|
||
| Date: | Wednesday, October 4, 2006 | |
| Time: | 8:00 AM – 5:50 PM (Eastern Standard Time) | |
| Location: | Princeton Plasma Physics Laboratory - Room LSB318 | |
| Phone: | (609) 243-2653 | |
| 7:30 am | Coffee | |
|
Administrative/General
|
||
| 8:00 10 m | Welcome to PPPL and Logistical/safety information | M. Zarnstorff |
| 8:10 5 m | Review Meeting Agenda | L. Waganer |
| 8:15 15 m | Summary of Preparations for Formal Review Meeting/Plans | F. Najmabadi |
| Compact Stellarator Integrated Systems Assessment | ||
| 8:30 30 m | Preview of ARIES-CS Summary Presentation | F. Najmabadi |
| Compact Stellarator Physics Basis | ||
| 9:00 60 m | Preview of Physics and Coil Presentation & Backup Data | L-P Ku |
| 10:00 15 m | Break | |
| 10:15 15 m | Expected Beta Performance Limits (Terpsichore Analysis) | A. Turnbull |
| Compact Stellarator Reactor Integrated Systems Assessment | ||
| 10:30 60 m | Determination of ARIES-CS Plasma & Device Parameters and Costing | J. Lyon |
| 11:30 15 m | Break and Prepare for Working Lunch | |
| Compact Stellarator Power Core Engineering Assessment | ||
| 11:45 75 m | Preview of Power Core Engineering Presentation & Backup | Rene Raffray |
| 1:00 45 m | Baseline Divertor/Baffle Solution (Geometry and Heat Load) | T.K. Mau |
| 1:45 15 m | Baseline ECH Plasma Heating Solution (Performance, Configuration) | T.K. Mau |
| 2:00 15 m | Neutron Wall Loading and Heat Flux Distributions | P. Wilson |
| 2:15 15 m | Status of 3-D Analysis and Neutron Streaming Through Penetrations | L. El-Guebaly |
| 2:30 20 m | Make up time | All |
| 2:50 10 m | Break | |
| 3:00 15 m | Vacuum Pumping Systems Definition (PPT) (PDF) | F. Najmabadi |
| 3:15 15 m | Design Definition of Stellarator Coil Systems | L. Bromberg |
| 3:30 15 m | Summary Low Cost Fabrication of Integrated Coil Structure | L. Waganer |
| 3:45 20 m | Layout of Power Core Elements and Buildings
(Bioshield support, New Aux. Maintenance and ECH Ports) |
X. Wang |
| 4:05 15 m | Updates on the ARIES-CS Coil Structural Analysis | X. Wang |
| 4:20 30 m | Maintenance Approach and Availability Analysis Flexdeburr Connecting Rods (mpg) Tool Changer demo (wmv) |
L. Waganer |
| 4:50 30 m | Safety Assessment Results | B. Merrill |
| 5:20 30 m | Wrap-up and Recommended Changes to Review Presentations | F. Najmabadi |
| 5:50 pm | Meeting Adjourns | |
|
|
||
Back to top of page
|
Begin ARIES CS Review Meeting |
|
|
||
| ARIES CS Review Meeting | ||
|
|
||
| Date: | Thursday, October 5, 2006 | |
| Time: | 8:00 AM &ndash 3:00 PM (Eastern Standard Time) | |
| Phone: | (609) 243-2653 | |
| 7:30 am | Coffee | |
|
Administrative/General
|
||
| 8:00 5 m | Welcome to PPPL and Logistical/safety information | R. Goldston |
| 8:05 10 m | Introductions and Review of Formal Review Meeting Agenda | Farrokh Najmabadi |
|
Compact Stellarator Reactor Integrated Systems Assessment
|
||
| 8:15 30 m | ARIES CS Summary Presentation (PDF) (PPT) | Farrokh Najmabadi |
|
Compact Stellarator Reactor Physics Basis
|
||
| 8:45 60 m | ARIES-CS Physics and Coil Presentation | Long Poe Ku |
| 9:45 15 m | Break | |
|
Compact Stellarator Integrated Systems Assessment
|
||
| 10:00 60 m | Determination of ARIES-CS Plasma & Device Parameters and Costing | Jim Lyon |
|
Compact Stellarator Power Core Engineering Assessment
|
||
| 11:00 75 m | ARIES-CS Power Core Engineering Presentation | Rene Raffray |
| 12:15 15 m | Break/Review Committee prepare for working lunch | |
|
Closed Session — Review Panel Deliberations
|
||
| 12:30 90 m | Discussion of Presented Material and Formulation of Recommendations | Dale Meade |
|
Review Panel Recommendations
|
||
| 2:00 30 m | Presentation of Review Panel Recommendations | Dale Meade |
| 2:30 30 m | Discussion of Review Panel Recommendations | Farrokh Najmabadi |
| 3:00 PM | Adjourn Meeting | |
|
|
||
| Back to top of page | |
| Return to NCSX Main Page Last update: October 25, 2006 Contact Webmaster: Phampton@pppl.gov | |
|
|
|