The (3) recommendations that were made by the ACC committee as a result of the July 20th review of stations 1A, 1b and 4, have been completed. Jim Recommendation: Station #1B [Casting Prep Station] - The ACC recommends that the Operating procedure and JHA be signed off prior to operation of this Station. Status: The procedures for stations 1a & b [casting prep] and station 2 & 4 [winding] have been updated and signed off. The JHA for station 1a & b has been written and is being reviewed by IH. This will remain a living document that will be modified as required in the field. Recommendation: Station #1A [Casting Prep Station] - The ACC recommends that the 1/2 Ton hoist be verified ready by M. Viola, the Labs lift engineer, prior to operation. Status: The status of the hoist has been verified and the hoist is acceptable. Recommendation: Station #4 [Winding Station] - The ACC recommends that, prior to operation, the walkway from the back exit be delineated by tape or paint to assure door clearance and a clear emergency exit route. Status: The aisle has been identified for emergency exit route and taped with yellow/black striped tape.