Review Title DC Transmission Tower PDR
Date 17 February  2004
Cognizant Engineer Raki Ramakrishnan
Responsible Line Manager Al von Halle
Review Board Chairperson Al von Halle
Review Board Members John Lacenere, Henry Carnevale, Larry Dudek, Robert Parsells, Charles Neumeyer
Invited Attendees Art Wise, Frank Jones, Don McBride, Rick van Kirk, Rich Borusovic, Gary Oliaro
Other Attendees Carl Potensky, Ron Koon, Gene Baker, J.W. Anderson,  Alex Ilic,  Leif Dietrich, Hutch Neilson, Jeff Makiel,  Wayne Reiersen, Gregg Pitonak, Jerry Levine (QA), Frank Malinowski (QA)
Charge None
Design Review Material

Announcement

Presentation

Drawing: /Snap-srv/share1/Rick Van Kirk/DC Transm-PDR

Chits and Project Disposition

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules    
Regulatory compliance including USQD and NEPA ISM Plan to be specified in the SOW
Disposition of CHITS from previous reviews N/A
Cost objectives

Other review objectives addressed

(Attachment 4 of ENG-033)

   

Summary of Results

The intent of this PDR was to provide a comprehensive review of the preliminary drawings of the D to C site Transmission system for the NCSX project as designed by The Burns Group, Philadelphia, PA.  These drawings are considered to be complete to the 70% level.  The review board members and invited attendees were asked to provide comments on the proposed design on drawing details, system height and routing (the transmission line crosses two roads), location of bases and structural members, installation of trays and cables, and safety concerns.  

Disposition

(check one)

1  Acceptable
Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
1   Incomplete - Additional work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
1   Action required by Disposition is complete