| Review
          Title | DC Transmission Tower PDR | 
      
        | Date | 17 February  2004 | 
      
        | Cognizant Engineer | Raki Ramakrishnan | 
      
        | Responsible Line Manager | Al von Halle | 
      
        | Review Board Chairperson | Al von Halle | 
      
        | Review Board Members | John Lacenere, Henry 
        Carnevale, Larry Dudek, Robert Parsells, Charles Neumeyer | 
      
        | Invited Attendees | Art Wise, Frank Jones, Don 
        McBride, Rick van Kirk, Rich Borusovic, Gary Oliaro | 
      
        | Other Attendees | Carl Potensky, Ron Koon, Gene 
    Baker, J.W. Anderson,  Alex Ilic,  Leif Dietrich, Hutch Neilson, 
    Jeff Makiel,  Wayne Reiersen, Gregg Pitonak, Jerry Levine (QA), Frank 
    Malinowski (QA) | 
      
        | Charge | None | 
      
        | Design Review Material | 
        Announcement 
        
        Presentation  
        Drawing: 
        
        /Snap-srv/share1/Rick 
        Van Kirk/DC Transm-PDR 
        
        Chits and Project 
        Disposition | 
      
        | Review Board Report |   | 
      
        | Items Reviewed | 
           | Sat | Unsat | Comments | 
      
        | Appropriate requirements identified |   |  |  | 
      
        | Development plans and schedules |   |  |  | 
      
        | Regulatory compliance including USQD and NEPA |   |   | ISM Plan to be specified in the 
    SOW | 
      
        | Disposition of CHITS from previous reviews |   |   | N/A | 
      
        | Cost 
          objectives |   |   |   | 
      
        | 
          Other 
          review objectives addressed 
          
          (Attachment 4 of ENG-033) |   |  |  | 
      
        | 
          Summary of Results | 
    The intent of this PDR was to 
    provide a comprehensive review of the preliminary drawings of the D to C 
    site Transmission system for the NCSX project as designed by The Burns 
    Group, Philadelphia, PA.  These drawings are considered to be complete 
    to the 70% level.  The review board members and invited attendees were 
    asked to provide comments on the proposed design on drawing details, system 
    height and routing (the transmission line crosses two roads), location of 
    bases and structural members, installation of trays and cables, and safety 
    concerns.   
         | 
      
        | 
          Disposition 
          (check  one) | 1  
     Acceptable | 
      
        |  Acceptable pending resolution of concerns - 
    CHITS identified above must be resolved prior to installation. | 
      
        | 1   
    Incomplete -
    Additional  work is required prior to another design review. | 
      
        | 
          Cog Engineer Close-out 
          (check  
           when done) |  | 
      
        | 1   
    Action required by Disposition is complete |