Review
Title |
DC Transmission Tower PDR |
Date |
17 February 2004 |
Cognizant Engineer |
Raki Ramakrishnan |
Responsible Line Manager |
Al von Halle |
Review Board Chairperson |
Al von Halle |
Review Board Members |
John Lacenere, Henry
Carnevale, Larry Dudek, Robert Parsells, Charles Neumeyer |
Invited Attendees |
Art Wise, Frank Jones, Don
McBride, Rick van Kirk, Rich Borusovic, Gary Oliaro |
Other Attendees |
Carl Potensky, Ron Koon, Gene
Baker, J.W. Anderson, Alex Ilic, Leif Dietrich, Hutch Neilson,
Jeff Makiel, Wayne Reiersen, Gregg Pitonak, Jerry Levine (QA), Frank
Malinowski (QA) |
Charge |
None |
Design Review Material |
Announcement
Presentation
Drawing:
/Snap-srv/share1/Rick
Van Kirk/DC Transm-PDR
Chits and Project
Disposition |
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
|
Regulatory compliance including USQD and NEPA |
|
|
ISM Plan to be specified in the
SOW
|
Disposition of CHITS from previous reviews |
|
|
N/A |
Cost
objectives |
|
|
|
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
The intent of this PDR was to
provide a comprehensive review of the preliminary drawings of the D to C
site Transmission system for the NCSX project as designed by The Burns
Group, Philadelphia, PA. These drawings are considered to be complete
to the 70% level. The review board members and invited attendees were
asked to provide comments on the proposed design on drawing details, system
height and routing (the transmission line crosses two roads), location of
bases and structural members, installation of trays and cables, and safety
concerns.
|
Disposition
(check one) |
1
Acceptable |
Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
1
Incomplete -
Additional work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |