Review
Title |
Modular Coil Winding Pack
Peer Review |
Date |
19 March 2004 |
Cognizant
Engineer |
Dave Williamson |
Responsible Line Manager |
Brad Nelson |
Review Board Chairperson |
Wayne Reiersen |
Review Board Members |
J. Chrzanowski, M. Cole, A.
Brooks, S. Raftopoulos |
Invited Attendees |
H. Neilson, M. Zarnstorff,
T. Brown, F. Dahlgren, HM Fan, K. Freudenberg, P. Fogarty |
Other Attendees |
|
Charge |
Are the
winding pack components and configuration fully defined?
Does the winding pack as envisaged
for the modular coils
1.
match the winding plan
and insulation materials envisioned by Jim Chrzanowski and PPPL winding team?
1.
2.
provide
adequate performance?
3.
3. provide
adequate shim thicknesses for maintaining the winding tolerances?
4.
4. provide
adequate electrical insulation?
5.
5.
provide
enough allowance for the copper chill plates to meet cooling requirements?
|
Design Review Material |
Announcement
Presentation
Chits and Project
Disposition |
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
Not applicable |
Regulatory compliance including USQD and NEPA |
|
|
Not applicable |
Disposition of CHITS from previous reviews |
|
|
Not applicable |
Cost
objectives |
|
|
Not applicable |
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
Not applicable |
Summary of Results
|
Acceptable pending resolution of
concerns
|
Disposition
(check
one) |
Acceptable |
Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
Incomplete -
Additional work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
|