Engineering > Design Review > WBS 14
Review Title Coil Test Facility Plumbing FDR
Date 10 November  2004
Cognizant Engineer Geoff Gettelfinger
Responsible Line Manager Al vonHalle
Review Board Chairperson Erik Perry
Review Board Members Jim Chrzanowski, Mike Kalish, Art Brooks, Dave Williamson, Brad Nelson
Invited Attendees
Attendees Don Hinman, Wayne Reiersen, Steve Raftopoulos, Hutch Neilson, Jerry Levine, Margaret Lumia
Charge
  • The requirements are documented
  • The design satisfies the requirements
  • The design has appropriate safety features incorporated
  • The design documentation is adequate and appropriate to complete the installation
Design Review Material

Announcement

Coil Test Facility Plumbing Presentation

Chits and Disposition Plan

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules    
Regulatory compliance including USQD and NEPA   NEPA 1312
Disposition of CHITS from previous reviews  
Cost objectives  

Other review objectives addressed

(Attachment 4 of ENG-033)

 

Summary of Results

Design of the NCSX Coil Test Facility single phase LN2 Mechanical/Plumbing Final Design was successfully presented by G. Gettelfinger.

Disposition

(check  one)

1 Acceptable
Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
1 Action required by Disposition is complete