| Review
          Title | C Type Upper and Lower Lead 
		Blocks FDR | 
      
        | Date | 03 June  2005 | 
      
        | Cognizant
          Engineer | Dave Williamson | 
      
        | Responsible Line Manager | Brad Nelson | 
      
        | Review Board Chairperson | Wayne Reiersen | 
      
        | Review Board Members | Jim Chrzanowski, Larry 
		Dudek, Phil Heitzenroeder, Art Brooks | 
      
        | Invitees | Wayne Reiersen, Mike 
		Zarnstorff, Paul Fogarty, Kevin Freudenberg, Steve Raftopoulos, 
		Brent Stratton, Greg Pitonak, Jeff Makiel, Jim Chrzanowski, Larry Dudek, 
		Phil Heitzenroeder, Art Brooks, Hutch Neilson | 
      
        | Attendees | Brad Nelson, David 
		Williamson, Jim Chrzanowski, Larry Dudek, Hutch Neilson, Art Brooks, 
		Jeff Makiel, Wayne Reiersen, Bob Simmons, Paul Fogarty | 
      
        | Charge | 1.     
			Does the lead block design 
 1.1   Provide a geometry into which the conductor can be 
			readily “wound”?
 
 1.2   Fix the conductors in the lead region in a 
			repeatable pattern for each coil of the same type?
 
 1.3   Support the conductor structurally?
 
 1.4    Isolate the conductors from each other 
			electrically?
 
 1.5   Maintain cooling continuity in the lead region?
 
 1.6   Stay within the geometric envelope used for VV/mod 
			coil assembly?
 
 1.7   Maintain acceptable field errors?
 
 2.    Have the drawings and models been reviewed and 
			are they ready for promotion to 
			fabrication level?
 | 
      
        | Design Review Material | 
        
        Announcement 
        
		Report  
        
		Presentation  | 
      
        | Review Board Report |  | 
      
        | Items Reviewed | 
    
     | Sat | Unsat | Comments | 
      
        | Appropriate requirements identified |  |   |  | 
      
        | Development plans and schedules |  |   |  | 
      
        | Regulatory compliance including USQD and NEPA |  |   |  | 
      
        | Disposition of CHITS from previous reviews |  |   |  | 
      
        | Cost 
          objectives |  |   |  | 
      
        | 
          Other 
          review objectives addressed 
          
          (Attachment 4 of ENG-033) |  |   |  | 
      
        | 
          Summary of Results |  | 
      
        | 
          Disposition 
          (check 
     one) | 1  Acceptable | 
      
        | 1  Acceptable pending resolution of concerns - 
    CHITS identified above must be resolved prior to installation. | 
      
        | 1Incomplete -
    Additional design 
    work is required prior to another design review. | 
      
        | 
          Cog Engineer Close-out 
          (check 
     when done) |  | 
      
        | 1  
    Action required by Disposition is complete |