Review Title NCSX Machine Platform FDR
Date 15 June  2005
Cognizant Engineer Erik Perry
Responsible Line Manager Wayne Reiersen
Review Board Chairperson Larry Dudek
Review Board Members Mike Viola, Geoff Gettelfinger, Dave Johnson, Jerry Levine
Invitees Larry Dudek, Geoff Gettelfinger, Dave Johnson, Jerry Levine, Judy Malsbury, Brad Nelson, Wayne Reiersen, Mike Viola, Mike Messineo, Raki Ramakrishnan, Lane Roquemore, Brent Stratton, Ron Strykowsky
Attendees Mike Cole, Dave Johnson, Larry Dudek, Tom Brown, Jerry Levine, Erik Perry, Geoff Gettelfinger, Ron Strykowsky, Mike Viola, Jeff Makiel, Mike Messineo, Mike Zarnstorff, Brent Stratton
Charge The purpose of the FDR is to assure:
  1. That is meets its functional requirements in a safe manner
  2. That the technical documentation (e.g. approved drawings) is adequate to proceed with fabrication and assembly and
  3. The projected cost (ETC) and schedule to complete the platform is consonant with the cost and schedule baseline.
Design Review Material

Announcement

Presentation

Chit and Disposition Plan

Drawings

  se730-001

  se730-002

  se730-003

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified  
Development plans and schedules  
Regulatory compliance including USQD and NEPA   Pending
Disposition of CHITS from previous reviews    
Cost objectives    

Other review objectives addressed

(Attachment 4 of ENG-033)

   

Summary of Results

This review was considered successful pending resolution of chits.  Four chits were generated and dispositioned at this review.

Disposition

(check  one)

 1  Acceptable
  Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 1Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete