Review
Title |
Vacuum Vessel Interfaces
Peer Review |
Date |
1 December 2005 |
Cognizant
Engineer |
Paul Goranson |
Responsible Line Manager |
Brad Nelson |
Review Board Chairperson |
Wayne Reiersen |
Review Board Members |
Brad Nelson, Charlie
Neumeyer, Larry Dudek, Bob Simmons, Ron Strykowsky |
Invitees |
Paul Goranson, Brad Nelson,
Bob Simmons, Hutch Neilson, Ron Strykowsky, Mike Cole, Tom Brown, Mike
Kalish Geoff Gettelfinger, Dave Johnson, Brent Stratton, George Labik,
Raki Ramakrishnan, Bill Blanchard, Larry Dudek, Charlie Neumeyer, Mike
Williams, Wayne Reiersen, Jim Lyon, Dave Williamson |
Attendees |
Wayne Reiersen, Tom Brown,
Raki Ramakrishnan, Dave Johnson, Bob Simmons, Brad Nelson, Mike Dave
Williamson, Paul Goranson, Jeff Makiel, George Labik, Geoff
Gettelfinger, Charlie Neumeyer, Bill Blanchard, Paul Sichta, Tim
Stevenson, Brent Stratton, Ron Strykowsky, Hutch Neilson |
Charge |
For each interface, is the
existing analysis, design, and interface documentation is adequate
and appropriate for closing out VV final design?
The review was well
attended. WBS Managers for interfacing systems were the presenters
and came well prepared. It soon became apparent that in general, the
existing analysis, design, and interface documentation is NOT
adequate for closing out VV final design. Nevertheless, the peer
review was very helpful in identifying work that remains to be done.
Eighteen chits were collected. In addition, Reiersen submitted a
memorandum with notes and action items (051201_VV
Interfaces_12_WTR.doc) from the peer review. The chits in
conjunction with Reiersen’s memo, adequately document the work that
remains to be done. The review committee recommends that VV
interfaces be reviewed again before closing out VV final design.”
In addition, please [1] post the attached memo as Reiersen’s notes
and action items and [2] Move the document posted as “Pump
requirements and design” under presentations and post as “Bill
Blanchard”. |
Design Review Material |
Announcement
Chits and Disposition
Committee Report
Signed
Specification
Pump Requirements &
Design
Design Basis Analysis
Drawings
**Presentations**
Mike Cole
Geoff Gettelfinger
Paul Goranson
Paul Sichta
David Williamson
Raki Ramakrishnan
Dave Johnson
Wayne Reiersen
|
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
|
Regulatory compliance including USQD and NEPA |
|
|
|
Disposition of CHITS from previous reviews |
|
|
|
Cost
objectives |
|
|
|
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
|
Disposition
(check
one) |
1 Acceptable |
1
Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
1 Incomplete -
Additional design
work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |
|