Review
Title |
Clamp Design FDR |
Date |
23 March 2006 |
Cognizant
Engineer |
Paul Goranson |
Responsible Line Manager |
Brad Nelson |
Review Board Chairperson |
Wayne Reiersen |
Review Board Members |
Larry Dudek, Tom Brown, Mike
Cole, Mike Viola, Fred Dahlgren |
Invitees |
Paul Goranson, Brad Nelson,
Mike Cole, Tom Brown, Larry Dudek, Fred Dahlgren, George Labik, Mike
Zarnstorff, Kevin Freudenberg, Mike Viola, John Edwards, Hutch Neilson,
Mike Williams, Jerry Levine, Judy Malsbury, Bob Simmons |
Attendees |
Brad Nelson, Paul Goranson,
Mike Cole, Kevin Freudenberg, Tom Brown, Jerry Levine, George Labik,
Frank Malinowski, Larry Dudek, John Edwards, Fred Dahlgren, Wayne
Reiersen |
Charge |
The following are the
charge questions:
-
Does the clamp
design meet all performance requirements?
-
Do the clamps
satisfy envelope requirements? Are they compatible with the
mounting studs? Can they be readily installed?
-
Have potential
failure modes in the clamp assembly been adequately addressed in the
design?
-
Is the design
documentation required to procure, fabricate, and install the parts
adequately?
|
Design Review Material |
Announcement
Chits and Disposition
Presentation
Drawings
Summary of Results
|
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
|
Regulatory compliance including USQD and NEPA |
|
|
|
Disposition of CHITS from previous reviews |
|
|
|
Cost
objectives |
|
|
|
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
|
Disposition
(check
one) |
1 Acceptable |
1 Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
1 Incomplete -
Additional design
work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |
|