Review Title Vacuum Vessel Heater Tape and Thermocouple FDR
Date 27 April 2006
Cognizant Engineer Paul Goranson
Responsible Line Manager Brad Nelson
Review Board Chairperson Larry Dudek
Review Board Members Fred Dahlgren, Tom Brown, Mike Kalish, George Labik, Brad Nelson
Invitees Wayne Reiersen, Paul Goranson, Mike Cole, Tom Brown, Larry Dudek, Fred Dahlgren, George Labik, Mike Zarnstorff, Kevin Freudenberg, Mike Viola, John Edwards, Mike Kalish, Hutch Neilson, Mike Williams, Jerry Levine, Judy Malsbury, Bob Simmons
Attendees Fred Dahlgren, Tom Brown, Mike Kalish, Larry Dudek, George Labik, Brad Nelson, Jerry Levine, Frank Malinowski, John Edwards, Mike Viola, Mike Cole, Kevin Freudenberg
Charge 1. Does the heater tape and thermocouple selection and placement meet all performance requirements?

2. Do the heater tapes and thermocouples satisfy envelope, requirements?  Are they compatible wit the cooling tubes, magnetic loops, mounting hardware, insulation, etc? Can they be readily installed.

3. Have potential failure modes been adequately addressed in the design?

4. Is the design documentation required to procure, fabricate, and install the parts adequate?

Design Review Material

Announcement

Chits and Disposition

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified  
Development plans and schedules
Regulatory compliance including USQD and NEPA  
Disposition of CHITS from previous reviews   None
Cost objectives

Other review objectives addressed

(Attachment 4 of ENG-033)

   

Summary of Results

Goranson presented the status of the heater tape design. There were seven chits generated and dispositioned at the review.  The heater tape and thermocouple selection and placement meet the performance requirements.  The heater tapes and thermocouples satisfy envelope requirements and are compatible with the cooling tubes, magnetic loops, mounting hardware, insulation.  The design documentation required to procure, fabricate, and install the parts was adequate.  The chits identified some issues with interface details with the cryostat feed-thrus, power supply requirements, MTBF, protection for the heaters and TC during installation, and a question of radiation resistance of the heaters.  This review was considered successful pending resolution of the chits.

Disposition

(check  one)

 1  Acceptable
  Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete