Engineering > Design Review > WBS 122
Review Title Vacuum Vessel Thermal Insulation FDR
Date 31 July 2006
Cognizant Engineer Paul Goranson
Responsible Line Manager Brad Nelson
Review Board Chairperson Wayne Reiersen
Review Board Members Tom Brown, Mike Cole, Larry Dudek, Mike Viola
Invitees Brad Nelson, Wayne Reiersen, Mike Cole, Larry Dudek, Mike Viola, Tom Brown, Paul Goranson, Bob Simmons, Hutch Neilson, Frank Malinowski, Geoff Gettelfinger, Dave Williamsons, Mike Zarnstorff, Hutch Neilson
Attendees Larry Dudek, Wayne Reiersen, Mike Viola, Tom Brown, Bob Simmons, Steve Raftopoulos, John Edwards, Brad Nelson, Paul Goranson, Mike Cole
Charge

1.  Does the final insulation and boot seal design meet all performance requirements and satisfy questions raised at the last review?

 2. Have potential failure modes been adequately addressed in the design?

 3. Are the assembly sequence drawings adequate and all parts called out on the drawings?

 4. Is the design documentation adequate?

Design Review Material

Announcement

Chits and Disposition

Presentation

Review Committee Report

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules
Regulatory compliance including USQD and NEPA    
Disposition of CHITS from previous reviews    
Cost objectives  

Other review objectives addressed

(Attachment 4 of ENG-033)

   

Summary of Results

Disposition

(check  one)

  1 Acceptable
  Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete