Engineering > Design Review > WBS 186
Review Title FPA Station 2 Tooling FDR
Date 20 September 2006
Cognizant Engineer Tom Brown
Responsible Line Manager Brad Nelson
Review Board Chairperson Wayne Reiersen
Review Board Members Mike Cole, Mike Viola, Kevin Freudenberg
Invitees Tom Brown, Wayne Reiersen, Mike Viola, Mike Duco, John Edwards, Larry Dudek, Fred Dahlgren, Kevin Freudenberg, Ron Strykowsky, Jim Chrzanowski, Dave Williamson, Lew Morris
Attendees Wayne Reiersen, Lew Morris, Tom Brown, Fred Dahlgren, Hutch Neilson, Ron Strykowsky, Mike Viola, Kevin Freudenberg, Mike Cole, Dave Williamson, John Edwards, Larry Dudek, Jeff Makiel
Charge • Does the tooling fixture provide adequate support and adjustability to perform the MCHP assembly?

• Are the drawings complete and ready for sign-off?

• Has the analysis been documented and checked?

• Is the fixture cost and procurement schedule consistent with the program schedule and budgets?

Design Review Material

Announcement

Chits and Disposition

Review Committee Report

Presentation

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules
Regulatory compliance including USQD and NEPA    
Disposition of CHITS from previous reviews    
Cost objectives  

Other review objectives addressed

(Attachment 4 of ENG-033)

   

Summary of Results

Disposition

(check  one)

  1 Acceptable
   Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete