Review
Title |
Modular Coil Interface
Hardware PDR |
Date |
22 February 2007 |
Cognizant
Engineer |
David
Williamson |
Responsible Line Manager |
Brad Nelson |
Review Board Chairperson |
Wayne Reiersen |
Review Board Members |
HM Fan, Art Brooks, Larry
Dudek, Phil Heitzenroeder, Mike Viola, Mike Cole, and Kevin Freudenberg
|
Invitees |
Brad Nelson, HM Fan, Art
Brooks, Larry Dudek, Phil Heitzenroeder, Mike Viola, Mike Cole, Kevin
Freudenberg, Tom Brown, Bob Ellis, Hutch Neilson, Paul Goranson, Paul
Fogarty, Mike Williams, John Edwards, Mike Duco, Geoff Gettelfinger
|
Attendees |
Jim Tsai, Dave Williamson, Kevin
Freudenberg, Mike Cole, Jim Chrzanowski, Tom Brown, John Dong, Geoff
Gettelfinger, Hutch Nelson, Wayne Reiersen, Paul Sichta, Phil Heitzenroeder
|
Charge |
The review objectives
include...
* Define the location of additional
bolts
* Finalize the material selection and
design of the shim, load washer, and spherical washer
* Establish the minimum bolt preloads
for joints with through bolts and tapped holes
* Establish the adequacy of the bolted
joint design through analysis consistent with NCSX Structural and Cryogenic
Design Criteria and the NCSX Handbook for Bolted Joint Design (draft
attached)
* Document the envisioned assembly
sequence and assembly requirements
The review should establish a firm
basis for going forward with final design and for performing the tension
tests (PPPL) and shear tests (ORNL) to qualify the design of the modular
coil interface hardware. |
Design Review Material |
Announcement
Chits and Disposition
Presentation
Review Committee Report
|
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
|
|
|
Development plans and schedules |
|
|
|
Regulatory compliance including USQD and NEPA |
|
|
|
Disposition of CHITS from previous reviews |
|
|
|
Cost
objectives |
|
|
|
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
|
Disposition
(check
one) |
1 Acceptable |
1 Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
Incomplete -
Additional design
work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |
|