Review
Title |
Station 3 Lift Fixture,
Laser Screens and Brackets |
Date |
03 December 2007 |
Cognizant
Engineer |
Tom Brown |
Responsible Line Manager |
Phil Heitzenroeder |
Review Board Chairperson |
Phil Heitzenroeder |
Review Board Members |
Mike Viola, Bob Ellis, Steve Raftopoulos,
Mike Cole |
Invitees |
Bill Slavin, Larry Dudek, Tom
Brown, Lew Morris, Jeff Makiel, Mike Cole, Phil Heitzenroeder, Mike Viola,
John Edwards, Jim Anderson, Jerry Levine, Hutch Neilson, Art Brooks, Mike
Cole, Bob Ellis, Steve Raftopoulos |
Attendees |
Bill Slavin, Larry Dudek, Tom
Brown, Lew Morris, Jeff Makiel, Mike Cole, Phil Heitzenroeder, Mike Viola,
John Edwards, Jim Anderson, Jerry Levine, Hutch Neilson, Art Brooks,
Mike Cole, Bob Ellis, Steve Raftopoulos |
Charge |
- Are the requirements
well defined?
- Does the design meet the
requirements?
- Do the drawings define
the design adequately to be used as the sole basis for fabrication and
acceptance of the support fixture?
- Does the analysis
adequately underpin the design and have they been checked?
- Has safety been
adequately addressed in the design of the support fixture?
- Can the support fixture
be fabricated and installed within the budget and schedule indentified
in the project baseline?
- Have all relevant chits
from previous design reviews been adequately addressed?
|
Design Review Material |
Announcement
Chits and Disposition
Presentation
|
Review Board Report |
|
Items Reviewed |
|
Sat |
Unsat |
Comments |
Appropriate requirements identified
|
X |
|
|
Development plans and schedules |
X |
|
|
Regulatory compliance including USQD and NEPA |
|
|
N/A |
Disposition of CHITS from previous reviews |
|
|
N/A |
Cost
objectives |
X |
|
|
Other
review objectives addressed
(Attachment 4 of ENG-033) |
|
|
|
Summary of Results
|
14 Chits submitted. Most were associated
with bolts, & bolt criteria, and checking. A chit suggesting
upgrading the bolts from grade 5 to grade 8 was accepted. The
calculations allowable, and calculation checking will all be included in
this change. |
Disposition
(check
one) |
1 Acceptable |
Acceptable pending resolution of concerns -
CHITS identified above must be resolved prior to installation. |
1 Incomplete -
Additional design
work is required prior to another design review.
|
Cog Engineer Close-out
(check
when done) |
|
1
Action required by Disposition is complete |