From: Thomas G. Brown Sent: Wednesday, March 12, 2008 11:05 AM To: Marianne Tyrrell Subject: FW: PDR of Assembly Station 5 / Peer Review of Proposed Changes to Station 3 Fixtures Tuesday, March 11 at 9:30 AM Importance: High Marianne, my WBS is 1803. Phil’s announcement is below……… Tom ________________________________ From: Phil Heitzenroeder Sent: Monday, March 10, 2008 10:58 AM To: Tom Brown (tbrown@pppl.gov) Subject: FW: PDR of Assembly Station 5 / Peer Review of Proposed Changes to Station 3 Fixtures Tuesday, March 11 at 9:30 AM Importance: High Mr. Philip Heitzenroeder Head, Mechanical Engineering Division Princeton Plasma Physics Laboratory Princeton, NJ 08543 e-mail: pheitzen@pppl.gov Phone: 609-243-3043 Fax: 609-243-3030 ________________________________ From: Phil Heitzenroeder Sent: Thursday, March 06, 2008 10:49 AM To: Jeffrey Makiel; Judith A. Malsbury; Mike Cole; 'Kevin Freudenberg'; Jeffrey Harris (harrisjh@ornl.gov); Steve Raftopoulos; Paul Goranson (goransonpl@ornl.gov); Shawn Connolly; Mike Williams; 'Don Rej'; Hutch Neilson; Jerry D. Levine; Erik D. Perry; 'Jim Chrzanowski (jchrzanowski@pppl.gov)'; Michael E. Viola; 'Bob Ellis (rellis@pppl.gov)' Cc: Wayne T. Reiersen Subject: PDR of Assembly Station 5 / Peer Review of Proposed Changes to Station 3 Fixtures Tuesday, March 11 at 9:30 AM Importance: High -------------------------------------------------------- You are invited to participate in a PDR for Assembly Station 5, at 9:30 on Tuesday, March 11 the Engineering Conference Room. Remote participants can dial in on 1-877-952-1506; passcode 833648. This will be followed by peer review of proposed revisions to the Station 3 fixtures . Since the expertise of this group is compatible with this Peer Review, we would ask that the reviewers stay to participate in this review, also. . --------------------------------------------------- The cog engineer is Tom Brown Jim Chrzanowski will chair the review. The review committee members are Kevin Freudenberg, Eric Perry, Mike Viola, Paul Goranson, and Shawn Connolly Phil Heitzenroeder is the RLM. The charge to the review committee is as follows: 1) Are the requirements adequately defined and documented? Note: This does not require a SRD because it is not part of the experimental facility. However, the requirements will be defined and included as an addendum to the Sequence Plan, which will be archived on the NCSX Web as part of this review. 2) Is the design consistent with the requirements? 2) Are the design basis analyses and any supporting R&D documented and adequate? 3) Have the drawings and models been promoted to PD release level? Mr. Philip Heitzenroeder Head, Mechanical Engineering Division Princeton Plasma Physics Laboratory Princeton, NJ 08543 e-mail: pheitzen@pppl.gov Phone: 609-243-3043 Fax: 609-243-3030