Review Title NCSX Trim Coils FDR
Date 06 May 2008
Cognizant Engineer Mike Kalish
Responsible Line Manager Phil Heitzenroeder
Review Board Chairperson Al vonHalle
Review Board Members Al vonHalle, Raki Ramakrishnan, Ron Hatcher, Wayne Reiersen, Art Brooks, Jim Sims (LASL)
Invitees Al vonHalle, Raki Ramakrishnan, Ron Hatcher, Wayne Reiersen, Art Brooks, Jim Sims, Phil Heitzenroeder, Kevin Freudenberg, Tom Brown, Judy Malsbury, Mike Cole, Jeff Makiel, Jerry Levine, Hutch Neilson, Mike Zarnstorff, Don Rej, Mike Williams, Steve Raftopoulos, Jim Chrzanowski
Attendees  Judy Malsbury, Tom Meighan, Hutch Neilson, Kevin Ranahan, Jim Chrzanowski, Phil Heitzenroeder, Neil Pomphrey, Jeff Makiel, Bob Simmons, Richard Upcavage, Tom Brown, Mike Zarnstorff, Al vonHalle, Mike Kalish, Raki Ramakrishnan, Ron Hatcher, Jim Sims, Art Brooks
Charge 1. Are all required analyses complete and formally checked and adequate to establish that the proposed design is feasible and meets established design criteria?

2. Are the drawings and documentation adequate to support the procurement and/ or manufacturing process, installation, and ready for sign-off?

3. Is the plan for installation of the trim coils compatible with the machine assembly plans?

4. Is the Product Specification (C-SPEC) complete and satisfactory? Are the interfaces adequately defined?

5. Is the Work Planning form current, and have the applicable requirements been satisfied?

6. Have the chits from the PDR been resolved?

7. Are updated cost and schedule estimates available?

Design Review Material

Announcement

Chits and Disposition

Presentation

Design Analysis Report

SOW

B-SPEC

C-SPEC

Review Board Report  
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified X   SRD/CPEC/SOW approved
Development plans and schedules X Procurement schedule presented
Regulatory compliance including USQD and NEPA   Not covered in this review
Disposition of CHITS from previous reviews X PDR Chit resolution presented
Cost objectives X Cost/Schedule presented

Other review objectives addressed

(Attachment 4 of ENG-033)

 

Summary of Results

The final design of the NCSX trim coils was reviewed.  Coil drawings were complete (but not yet signed off), and included all aspects of the structural design and assembly of the two coil configurations used to make up the 48 coil set.  Drafts of the system specification (CSPEC) and Statement of work (SOW) were made available at the time of this FDR, but had not yet undergone a general project review.  All drawings and specifications have subsequently been reviewed and approved. A summary of the approved system requirements was presented as well as the results of the completed analysis of the structural design of coils and mountings for both electromagnetic and thermal loads.  Material specifications and tolerances were reviewed. The result of the testing of the proposed welding of coil structures was also presented. The proposed schedule and expected costs were presented and discussed.

 This FDR follows a comprehensive review of the preliminary design (held on 3/24/08), and the resolution of the chits from that PDR were reviewed.

 There were 7 chits recorded during this final design review, with suggestions concerning the review of specifications, the thermal performance of the coils in LN2, the analysis of the effects of these coils on other systems, welding techniques, winding geometry/techniques, mounting fastener details, and the possible need of a dedicated system Failure Modes and Effects Analysis (FMEA).  The review committee concurred with all chits, and agreed that this review was successful pending resolution of the chits.

Disposition

(check  one)

 1  Acceptable
  Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
  1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete

Privacy and Security Notice