NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Design Reviews > WBS 12 Design Reviews

Legend

 

 

Required

Date

Scheduled

Date

Conducted

Date

Chits Dispositioned

Date

 Closed

[Note]

See note below table

Please click on dates underlined in table below to access design review material...

 

WBS

Description

Peer Review or CDR

PDR

FDR

Other

12

Vacuum Vessel Systems

10/6/03

121

 Assembly

4/14/04

 

 

VV Port Configuration 1/29/04    

Prototype Vacuum Vessel Segment (PVVS)

7/8/03

122

Thermal Insulation

 

123

Heating and Cooling Distribution System

 

 

124

Supports

 

 

125

 Local I&C

 

 

Notes:

[1] Not in MIE Project, but design reviews will be required.

[2] Not design related. No design reviews required.

Privacy and Security Notice

Please forward comments and questions to the Webmaster