Legend
|
Required
|
Date
|
Scheduled
|
Date
|
Conducted
|
Date
|
Chits
Dispositioned
|
Date
|
Closed
|
[Note]
|
See
note below table
|
|
Please
click on dates underlined in table below to access design review
material...
WBS
|
Description
|
Peer
Review or CDR
|
PDR
|
FDR
|
Other
|
14
|
Modular
Coils
|
|
10/6/03
|
|
|
141
|
Winding
Forms
|
04/15/04
|
|
|
|
|
MCWF
Manufacturing Development and Prototype Fabrication Technical
Issues
|
01/23/03
|
|
|

|
|
Prototype
MCWF
|
|
|
09/30/03
|

|
142
|
Windings
and Assembly
|
|
|
|
|
|
VPI
and Molding Design
|
01/15/03
|
|
|
|
|
Racetrack
Test Coil
|
|
|
06/12/03
|
|
|
Twisted Racetrack
Coil Winding Form FDR
|
04/16/04
|
|
11/20/03
|
|
|
Modular Coil Winding
Peer Review |
3/19/04 |
|
|
|
143
|
Local
I&C
|
|
|
|
|
144
|
Modular Coil
Winding Facility and Fixtures
|
|
|
|
|
|
Winding
Facility
|
|
|
|
|
|
Autoclave
Systems
|
|
01/08/03
|
|
|
|
Autoclave
Pressure Vessel and Controls
|
|
|
06/03/03
|
|
|
Turning Fixture FDR
|
|
|
12/01/03
|
|
|
Coil Test Facility
DC Bus Modification
|
|
|
12/04/03
|
|
|