Review Title SXR Spacer Modifications FDR
Date 14 February 2006
Cognizant Engineer Tom Brown
Responsible Line Manager Wayne Reiersen
Review Board Chairperson Larry Dudek
Review Board Members Paul Goranson,  Tom Brown, Mike Cole, Dave Johnson, Brent Stratton
Invitees Larry Dudek, Wayne Reiersen, Paul Goranson, Mike Cole, Geoff Gettelfinger, Dave Johnson, Brent Stratton, Fred Dahlgren, Mike Viola, Brad Nelson, Hutch Neilson, Irving Zatz
Attendees  
Charge The following are the charge questions:

1. Is the design adequately underpinned by analysis?
2. Are the drawings complete?
3. Is there adequate space to install the VV spacer with the included SXR cans?
Design Review Material

Announcement

Chits and Disposition

Presentation

Drawings

  SE340-001

  SE340-002
Analysis

Review Board Report
Items Reviewed

Sat Unsat

Comments

Appropriate requirements identified    
Development plans and schedules
Regulatory compliance including USQD and NEPA    
Disposition of CHITS from previous reviews    
Cost objectives    

Other review objectives addressed

(Attachment 4 of ENG-033)

 

Summary of Results

Disposition

(check  one)

 1  Acceptable
 1Acceptable pending resolution of concerns - CHITS identified above must be resolved prior to installation.
 1 Incomplete - Additional design work is required prior to another design review.

Cog Engineer Close-out

(check  when done)

 
 1 Action required by Disposition is complete