Engineering > Design Reviews > WBS 1 Design Reviews > 01 Dec 2003 Turning Fixture FDR
Review Title Turning Fixture FDR
Date 01 December 2003
Cognizant Engineer Steve Raftopoulos
Responsible Line Manager Phil Heitzenroeder
Review Board Chairperson Bob Parsells

Charge

Charge

Specifications

Drawings

Other Design Review Material

Presentation material (Raftopoulos)

Chits

(See Project Deposition)

Review Committee Report

 Response to Charge

Project Disposition Plan

Project Disposition Plan