Database: NCSX PUNCHLIST.fp7
Records: 593
Task No.ItemRef.DescriptionWork StatusUpdateFPAStatus
T-080Coil B-2ECN5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
T-132Coil B-2ECN5140Cover entire lead area with cover/boxNot StartedNoOPEN
T-173Coil B-2Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
T-209Coil B-2Install thermocouples (coil areas)In-ProgressYesOPEN
T-281Coil B-2Documentation package complete and ready for copyIn-ProgressYesOPEN
T-351Coil B-2Grind overcastingIn-ProgressGrind additional areas noted in B1-C1 gross fitYesOPEN
T-503Coil B-2Install batt insulationCompleteYesQA CHECK
T-583Coil B-2Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
FileMaker Pro Version: 8.0v3
Build: 03-20-2006