Database: NCSX PUNCHLIST.fp7
Records: 593
Task No.ItemRef.DescriptionWork StatusUpdateFPAStatus
T-063Coil B-3ECN 5140In power bus tie in area- Install Kapton insulation over bolt to mitigate potentially short tracking pathIn-ProgressNoOPEN
T-081Coil B-3ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
T-133Coil B-3ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
T-174Coil B-3Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
T-210Coil B-3Install thermocouples (coil areas)In-ProgressYesOPEN
T-282Coil B-3Documentation package complete and ready for copyIn-ProgressYesOPEN
T-352Coil B-3Grind overcastingIn-ProgressGrind additional areas noted in B1-C1 gross fitYesOPEN
T-504Coil B-3Install batt insulationIn-ProgressYesOPEN
T-584Coil B-3Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
FileMaker Pro Version: 8.0v3
Build: 03-20-2006