| T-063 | Coil B-3 | ECN 5140 | In power bus tie in area- Install Kapton insulation over bolt to mitigate potentially short tracking path | In-Progress | | No | OPEN |
| T-081 | Coil B-3 | ECN 5140 | Install insulating washers on one side of the power bus connection to eliminate floating hardware [4] | Not Started | | No | OPEN |
| T-133 | Coil B-3 | ECN 5140 | Cover entire lead area with cover/box | Not Started | | No | OPEN |
| T-174 | Coil B-3 | | Terminate cooling lines- braze fitting to tubes/ fill tube penetration holes | Not Started | | No | OPEN |
| T-210 | Coil B-3 | | Install thermocouples (coil areas) | In-Progress | | Yes | OPEN |
| T-282 | Coil B-3 | | Documentation package complete and ready for copy | In-Progress | | Yes | OPEN |
| T-352 | Coil B-3 | | Grind overcasting | In-Progress | Grind additional areas noted in B1-C1 gross fit | Yes | OPEN |
| T-504 | Coil B-3 | | Install batt insulation | In-Progress | | Yes | OPEN |
| T-584 | Coil B-3 | | Electrical test (7.5 kV) following winding form re-work | Not Started | | Yes | OPEN |