Database: NCSX PUNCHLIST.fp7 |
Records: 593 |
Task No. | Item | Ref. | Description | Work Status | Update | FPA | Status |
T-050 | Coil B-6 | ECN 5140 | Cut fingers of top chill plates | In-Progress | | Yes | OPEN |
T-058 | Coil B-6 | ECN 5140 | Replace chill plates in lead and poloidal break areas with G-11 spacers | In-Progress | | Yes | OPEN |
T-066 | Coil B-6 | ECN 5140 | In power bus tie in area- Install Kapton insulation over bolt to mitigate potentially short tracking path | In-Progress | | No | OPEN |
T-084 | Coil B-6 | ECN 5140 | Install insulating washers on one side of the power bus connection to eliminate floating hardware [4] | Not Started | | No | OPEN |
T-092 | Coil B-6 | ECN 5140 | Install a Kapton or thin G-11 sheet underneath the jumper stack to increase the tracking distance | In-Progress | | Yes | OPEN |
T-100 | Coil B-6 | ECN 5140 | Install insulating plugs at bottom of the hole in the G-11 base plate to reduce the risk of the studs penetrating the G-11 backing plate | In-Progress | | Yes | OPEN |
T-118 | Coil B-6 | ECN 5140 | Electrically tie the three jumper studs to the bottom jumper | Not Started | | No | OPEN |
T-136 | Coil B-6 | ECN 5140 | Cover entire lead area with cover/box | Not Started | | No | OPEN |
T-177 | Coil B-6 | | Terminate cooling lines- braze fitting to tubes/ fill tube penetration holes | Not Started | | No | OPEN |
T-195 | Coil B-6 | | Install strain gauges- fiber optic | Not Started | Need design/Materials - awaiting Oak Ridge to finalize | Yes | OPEN |
T-213 | Coil B-6 | | Install thermocouples (coil areas) | Not Started | | Yes | OPEN |
T-231 | Coil B-6 | NCR 3634/3639 | Modify final coil clamps- permeability & fitup issues | Not Started | | Yes | OPEN |
T-249 | Coil B-6 | | Lock all clamp hardware- weld locking wire | In-Progress | | Yes | OPEN |
T-267 | Coil B-6 | | Mount final co-wound diagnostic box to casting | In-Progress | | Yes | OPEN |
T-285 | Coil B-6 | | Documentation package complete and ready for copy | In-Progress | | Yes | OPEN |
T-337 | Coil B-6 | | Metrology (pre-measurement) | Not Started | | Yes | OPEN |
T-355 | Coil B-6 | | Grind overcasting | Not Started | Grind additional areas noted in B1-C1 gross fit | Yes | OPEN |
T-391 | Coil B-6 | | Grinding/milling to accommodate nut access | In-Progress | | Yes | OPEN |
T-409 | Coil B-6 | | Check thread engagement on tapped holes | Not Started | | Yes | OPEN |
T-427 | Coil B-6 | | Check threads (run bolt through) on tapped holes | Not Started | | Yes | OPEN |
T-475 | Coil B-6 | | Correct clamp interference (#60, 69) | Not Started | | Yes | OPEN |
T-495 | Coil B-6 | | Complete electrical tests following VPI | Not Started | | Yes | OPEN |
T-507 | Coil B-6 | | Install batt insulation | Not Started | | Yes | OPEN |
T-544 | Coil B-6 | | Fabricate Bushings | In-Progress | | Yes | OPEN |
T-562 | Coil B-6 | | Remove epoxy overflow fittings | Not Started | | Yes | OPEN |
T-572 | Coil B-6 | | Secure terminal lug hardware | Not Started | | No | OPEN |
T-587 | Coil B-6 | | Electrical test (7.5 kV) following winding form re-work | Not Started | | Yes | OPEN |
FileMaker Pro Version: 8.0v3 |
Build: 03-20-2006 |