Database: NCSX PUNCHLIST.fp7
Records: 593
Task No.ItemRef.DescriptionWork StatusUpdateFPAStatus
T-006Coil C-6NCR 3643Over stock castings- use gauge block and grind clearances as necessary (Type C coils)Not StartedTo be completed at shop when cutting new bolt holesYesOPEN
T-038Coil C-6ECN 5140Cut fingers of top chill platesIn-ProgressYesOPEN
T-051Coil C-6ECN 5140Replace chill plates in lead and poloidal break areas with G-11 spacersIn-ProgressYesOPEN
T-059Coil C-6ECN 5140In power bus tie in area- Install Kapton insulation over bolt to mitigate potentially short tracking pathIn-ProgressNoOPEN
T-072Coil C-6ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
T-085Coil C-6ECN 5140Install a Kapton or thin G-11 sheet underneath the jumper stack to increase the tracking distanceIn-ProgressYesOPEN
T-093Coil C-6ECN 5140Install insulating plugs at bottom of the hole in the G-11 base plate to reduce the risk of the studs penetrating the G-11 backing plateIn-ProgressYesOPEN
T-106Coil C-6ECN 5140Electrically tie the three jumper studs to the bottom jumperNot StartedNoOPEN
T-124Coil C-6ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
T-142Coil C-6ECN 5140Tie poloidal break shims & bolts electrically to the winding formNot StartedRequires wire and weldingNoOPEN
T-165Coil C-6Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
T-183Coil C-6Install strain gauges- fiber opticNot StartedNeed design/Materials - awaiting Oak Ridge to finalizeYesOPEN
T-201Coil C-6Install thermocouples (coil areas)Not StartedYesOPEN
T-219Coil C-6NCR 3634/3639Modify final coil clamps- permeability & fitup issuesNot StartedYesOPEN
T-237Coil C-6Lock all clamp hardware- weld locking wireIn-ProgressYesOPEN
T-255Coil C-6Mount final co-wound diagnostic box to castingIn-ProgressYesOPEN
T-273Coil C-6Documentation package complete and ready for copyIn-ProgressYesOPEN
T-343Coil C-6Metrology (pre-measurement)Not StartedYesOPEN
T-361Coil C-6Grind overcastingNot StartedGrind additional areas noted in B1-C1 gross fitYesOPEN
T-379Coil C-6Add additional bolt holes (C-C)Not StartedYesOPEN
T-397Coil C-6Grinding/milling to accommodate nut accessIn-ProgressWork Request M1921YesOPEN
T-415Coil C-6Check thread engagement on tapped holesNot StartedYesOPEN
T-433Coil C-6Check threads (run bolt through) on tapped holesNot StartedYesOPEN
T-452Coil C-6Not StartedAdd more fiducialsNot StartedWork Request submitted (N1150)/Inconel rod on orderYesOPEN
T-462Coil C-6Secure terminal lug hardwareNot StartedNeeds parts and weldingNoOPEN
T-481Coil C-6Correct clamp interference (#63, 65, 69, 71)Not StartedYesOPEN
T-485Coil C-6Complete electrical tests following VPINot StartedYesOPEN
T-513Coil C-6Install batt insulationNot StartedYesOPEN
T-550Coil C-6Fabricate BushingsNot StartedYesOPEN
T-563Coil C-6Remove epoxy overflow fittingsNot StartedYesOPEN
T-593Coil C-6Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
FileMaker Pro Version: 8.0v3