Coil A-1T-073ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil A-1T-125ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil A-1T-166Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil A-1T-274Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil A-1T-496Install batt insulationCompleteYesQA CHECK
Coil A-2T-074ECN5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil A-2T-126ECN5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil A-2T-167Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil A-2T-203Install thermocouples (coil areas)In-ProgressYesOPEN
Coil A-2T-275Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil A-2T-345Grind overcastingIn-ProgressSmall spot on B flange still neededYesOPEN
Coil A-2T-497Install batt insulationCompleteYesQA CHECK
Coil A-2T-577Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil A-3T-075ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]NoOPEN
Coil A-3T-127ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil A-3T-168Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil A-3T-204Install thermocouples (coil areas)In-ProgressYesOPEN
Coil A-3T-276Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil A-3T-498Install batt insulationCompleteYesQA CHECK
Coil A-3T-578Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil A-4T-076ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil A-4T-128ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil A-4T-169Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil A-4T-205Install thermocouples (coil areas)Not StartedYesOPEN
Coil A-4T-277Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil A-4T-329Metrology (pre-measurement) also scan coil to vessel boss connectionIn-ProgressYesOPEN
Coil A-4T-467Correct clamp interference (#59, 61)Not StartedYesOPEN
Coil A-4T-499Install batt insulationNot StartedYesOPEN
Coil A-4T-531Repair dented cooling tube/RetestNot StartedYesOPEN
Coil A-4T-536Fabricate BushingsNot StartedYesOPEN
Coil A-4T-579Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil A-5T-061ECN 5140In power bus tie in area- Install Kapton insulation over bolt to mitigate potentially short tracking pathIn-ProgressNoOPEN
Coil A-5T-077ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil A-5T-129ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil A-5T-158Grind wing area type A coilsNot StartedTo be completed at shop when cutting new bolt holesYesOPEN
Coil A-5T-170Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil A-5T-188Install strain gauges- fiber opticNot StartedNeed design/Materials - awaiting Oak Ridge to finalizeYesOPEN
Coil A-5T-206Install thermocouples (coil areas)In-ProgressYesOPEN
Coil A-5T-278Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil A-5T-348Grind overcastingNot StartedYesOPEN
Coil A-5T-384Grinding/milling to accommodate nut accessIn-ProgressYesOPEN
Coil A-5T-402Check thread engagement on tapped holesNot StartedYesOPEN
Coil A-5T-420Check threads (run bolt through) on tapped holesNot StartedYesOPEN
Coil A-5T-435NCR 3701Remove supplier's tooling ball insertsNot StartedYesOPEN
Coil A-5T-500Install batt insulationCompleteYesQA CHECK
Coil A-5T-555Remove epoxy overflow fittingsNot StartedYesOPEN
Coil A-5T-566Secure terminal lug hardwareNot StartedNoOPEN
Coil A-5T-580Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil A-6T-044ECN 5140Cut fingers of top chill platesIn-ProgressYesOPEN
Coil A-6T-054ECN 5140Replace chill plates in lead and poloidal break areas with G-11 spacersIn-ProgressYesOPEN
Coil A-6T-062ECN 5140In power bus tie in area- Install Kapton insulation over bolt to mitigate potentially short tracking pathIn-ProgressNoOPEN
Coil A-6T-078ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil A-6T-088ECN 5140Install a Kapton or thin G-11 sheet underneath the jumper stack to increase the tracking distanceIn-ProgressYesOPEN
Coil A-6T-096ECN 5140Install insulating plugs at bottom of the hole in the G-11 base plate to reduce the risk of the studs penetrating the G-11 backing plateIn-ProgressYesOPEN
Coil A-6T-112ECN 5140Electrically tie the three jumper studs to the bottom jumperNot StartedNoOPEN
Coil A-6T-130ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil A-6T-171Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil A-6T-189Install strain gauges- fiber opticNot StartedNeed design/Materials - awaiting Oak Ridge to finalizeYesOPEN
Coil A-6T-207Install thermocouples (coil areas)Not StartedYesOPEN
Coil A-6T-225NCR 3634/3639Modify final coil clamps- permeability & fitup issuesNot StartedYesOPEN
Coil A-6T-243Lock all clamp hardware- weld locking wireIn-ProgressYesOPEN
Coil A-6T-261Mount final co-wound diagnostic box to castingIn-ProgressYesOPEN
Coil A-6T-279Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil A-6T-331Metrology (pre-measurement) also scan coil to vessel boss connectionNot StartedYesOPEN
Coil A-6T-403Check thread engagement on tapped holesNot StartedYesOPEN
Coil A-6T-421Check threads (run bolt through) on tapped holesNot StartedYesOPEN
Coil A-6T-436NCR 3706Remove supplier's tooling ball insertsNot StartedYesOPEN
Coil A-6T-469Correct clamp interference (#59, 61)Not StartedYesOPEN
Coil A-6T-490Complete electrical tests following VPINot StartedYesOPEN
Coil A-6T-501Install batt insulationNot StartedYesOPEN
Coil A-6T-538Fabricate BushingsIn-ProgressYesOPEN
Coil A-6T-556Remove epoxy overflow fittingsNot StartedYesOPEN
Coil A-6T-581Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil B-1T-079ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil B-1T-131ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil B-1T-172Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil B-1T-280Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil B-1T-502Install batt insulationNot StartedYesOPEN
Coil B-2T-080ECN5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil B-2T-132ECN5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil B-2T-173Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil B-2T-209Install thermocouples (coil areas)In-ProgressYesOPEN
Coil B-2T-281Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil B-2T-351Grind overcastingIn-ProgressGrind additional areas noted in B1-C1 gross fitYesOPEN
Coil B-2T-503Install batt insulationCompleteYesQA CHECK
Coil B-2T-583Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil B-3T-063ECN 5140In power bus tie in area- Install Kapton insulation over bolt to mitigate potentially short tracking pathIn-ProgressNoOPEN
Coil B-3T-081ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil B-3T-133ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil B-3T-174Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil B-3T-210Install thermocouples (coil areas)In-ProgressYesOPEN
Coil B-3T-282Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil B-3T-352Grind overcastingIn-ProgressGrind additional areas noted in B1-C1 gross fitYesOPEN
Coil B-3T-504Install batt insulationIn-ProgressYesOPEN
Coil B-3T-584Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil B-4T-082ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil B-4T-134ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil B-4T-175Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil B-4T-211Install thermocouples (coil areas)CompleteYesQA CHECK
Coil B-4T-283Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil B-4T-353Grind overcastingIn-ProgressGrind additional areas noted in B1-C1 gross fitYesOPEN
Coil B-4T-407Check thread engagement on tapped holesNot StartedYesOPEN
Coil B-4T-425Check threads (run bolt through) on tapped holesNot StartedYesOPEN
Coil B-4T-453NCR 3696Remove supplier's tooling ball insertsNot StartedYesOPEN
Coil B-4T-505Install batt insulationNot StartedYesOPEN
Coil B-4T-585Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil B-5T-049ECN 5140Cut fingers of top chill platesIn-ProgressYesOPEN
Coil B-5T-057ECN 5140Replace chill plates in lead and poloidal break areas with G-11 spacersIn-ProgressYesOPEN
Coil B-5T-065ECN 5140In power bus tie in area- Install Kapton insulation over bolt to mitigate potentially short tracking pathIn-ProgressNoOPEN
Coil B-5T-083ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil B-5T-091ECN 5140Install a Kapton or thin G-11 sheet underneath the jumper stack to increase the tracking distanceIn-ProgressYesOPEN
Coil B-5T-099ECN 5140Install insulating plugs at bottom of the hole in the G-11 base plate to reduce the risk of the studs penetrating the G-11 backing plateIn-ProgressYesOPEN
Coil B-5T-117ECN 5140Electrically tie the three jumper studs to the bottom jumperNot StartedNoOPEN
Coil B-5T-135ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil B-5T-153ECN 5140Tie poloidal break shims & bolts electrically to the winding formNot StartedRequires wire and weldingNoOPEN
Coil B-5T-176Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil B-5T-194Install strain gauges- fiber opticNot StartedNeed design/Materials - awaiting Oak Ridge to finalizeYesOPEN
Coil B-5T-212Install thermocouples (coil areas)Not StartedYesOPEN
Coil B-5T-230NCR 3634/3639Modify final coil clamps- permeability & fitup issuesNot StartedYesOPEN
Coil B-5T-248Lock all clamp hardware- weld locking wireIn-ProgressYesOPEN
Coil B-5T-266Mount final co-wound diagnostic box to castingIn-ProgressYesOPEN
Coil B-5T-284Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil B-5T-336Metrology (pre-measurement)Not StartedYesOPEN
Coil B-5T-354Grind overcastingIn-ProgressGrind additional areas noted in B1-C1 gross fitYesOPEN
Coil B-5T-390Grinding/milling to accommodate nut accessIn-ProgressYesOPEN
Coil B-5T-408Check thread engagement on tapped holesNot StartedYesOPEN
Coil B-5T-426Check threads (run bolt through) on tapped holesNot StartedYesOPEN
Coil B-5T-434NCR 3700Remove supplier's tooling ball insertsNot StartedYesOPEN
Coil B-5T-445Not StartedAdd more fiducialsNot StartedWork Request submitted (N1150)/Inconel rod on orderYesOPEN
Coil B-5T-474Correct clamp interference (#60, 69)Not StartedYesOPEN
Coil B-5T-494Complete electrical tests following VPINot StartedYesOPEN
Coil B-5T-506Install batt insulationNot StartedYesOPEN
Coil B-5T-543Fabricate BushingsNot StartedYesOPEN
Coil B-5T-561Remove epoxy overflow fittingsNot StartedYesOPEN
Coil B-5T-571Secure terminal lug hardwareNot StartedNoOPEN
Coil B-5T-586Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil B-6T-050ECN 5140Cut fingers of top chill platesIn-ProgressYesOPEN
Coil B-6T-058ECN 5140Replace chill plates in lead and poloidal break areas with G-11 spacersIn-ProgressYesOPEN
Coil B-6T-066ECN 5140In power bus tie in area- Install Kapton insulation over bolt to mitigate potentially short tracking pathIn-ProgressNoOPEN
Coil B-6T-084ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil B-6T-092ECN 5140Install a Kapton or thin G-11 sheet underneath the jumper stack to increase the tracking distanceIn-ProgressYesOPEN
Coil B-6T-100ECN 5140Install insulating plugs at bottom of the hole in the G-11 base plate to reduce the risk of the studs penetrating the G-11 backing plateIn-ProgressYesOPEN
Coil B-6T-118ECN 5140Electrically tie the three jumper studs to the bottom jumperNot StartedNoOPEN
Coil B-6T-136ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil B-6T-177Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil B-6T-195Install strain gauges- fiber opticNot StartedNeed design/Materials - awaiting Oak Ridge to finalizeYesOPEN
Coil B-6T-213Install thermocouples (coil areas)Not StartedYesOPEN
Coil B-6T-231NCR 3634/3639Modify final coil clamps- permeability & fitup issuesNot StartedYesOPEN
Coil B-6T-249Lock all clamp hardware- weld locking wireIn-ProgressYesOPEN
Coil B-6T-267Mount final co-wound diagnostic box to castingIn-ProgressYesOPEN
Coil B-6T-285Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil B-6T-337Metrology (pre-measurement)Not StartedYesOPEN
Coil B-6T-355Grind overcastingNot StartedGrind additional areas noted in B1-C1 gross fitYesOPEN
Coil B-6T-391Grinding/milling to accommodate nut accessIn-ProgressYesOPEN
Coil B-6T-409Check thread engagement on tapped holesNot StartedYesOPEN
Coil B-6T-427Check threads (run bolt through) on tapped holesNot StartedYesOPEN
Coil B-6T-475Correct clamp interference (#60, 69)Not StartedYesOPEN
Coil B-6T-495Complete electrical tests following VPINot StartedYesOPEN
Coil B-6T-507Install batt insulationNot StartedYesOPEN
Coil B-6T-544Fabricate BushingsIn-ProgressYesOPEN
Coil B-6T-562Remove epoxy overflow fittingsNot StartedYesOPEN
Coil B-6T-572Secure terminal lug hardwareNot StartedNoOPEN
Coil B-6T-587Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil C-1T-067ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil C-1T-119ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil C-1T-160Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil C-1T-268Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil C-1T-457Secure terminal lug hardwareNot StartedNoOPEN
Coil C-1T-508Install batt insulationCompleteYesQA CHECK
Coil C-1T-588Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil C-2T-068ECN5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil C-2T-120ECN5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil C-2T-161Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil C-2T-197Install thermocouples (coil areas)In-ProgressYesOPEN
Coil C-2T-269Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil C-2T-323QA Action TicketAdjust cooling tubes for coil to coil fitNot StartedOPEN
Coil C-2T-324QA Action TicketGrind poloidal bk. winding clamp studNot StartedOPEN
Coil C-2T-357Grind overcastingNot StartedGrind additional areas noted in B1-C1 gross fitYesOPEN
Coil C-2T-509Install batt insulationNot StartedYesOPEN
Coil C-2T-589Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil C-3T-005NCR 3643Over stock castings- use gauge block and grind clearances as necessary (Type C coils)Not StartedTo be completed at shop when cutting new bolt holesYesOPEN
Coil C-3T-069ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil C-3T-103ECN 5140Electrically tie the three jumper studs to the bottom jumperNot StartedNoOPEN
Coil C-3T-121ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil C-3T-139ECN 5140Tie poloidal break shims & bolts electrically to the winding formNot StartedRequires wire and weldingNoOPEN
Coil C-3T-162Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil C-3T-198Install thermocouples (coil areas)Not StartedYesOPEN
Coil C-3T-252Mount final co-wound diagnostic box to castingIn-ProgressYesOPEN
Coil C-3T-270Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil C-3T-307QA Action TicketAdjust cooling tubes for coil to coil fitNot StartedOPEN
Coil C-3T-340Metrology (pre-measurement)Not StartedYesOPEN
Coil C-3T-358Grind overcastingIn-ProgressGrind additional areas noted in B1-C1 gross fitYesOPEN
Coil C-3T-412Check thread engagement on tapped holesNot StartedYesOPEN
Coil C-3T-430Check threads (run bolt through) on tapped holesNot StartedYesOPEN
Coil C-3T-449Not StartedAdd more fiducialsNot StartedYesOPEN
Coil C-3T-459Secure terminal lug hardwareNot StartedNeeds parts and weldingNoOPEN
Coil C-3T-510Install batt insulationNot StartedYesOPEN
Coil C-3T-590Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil C-4T-070ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil C-4T-122ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil C-4T-140ECN 5140Tie poloidal break shims & bolts electrically to the winding formNot StartedRequires wire and weldingNoOPEN
Coil C-4T-163Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil C-4T-199Install thermocouples (coil areas)Not StartedYesOPEN
Coil C-4T-271Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil C-4T-315QA Action TicketRemove epoxy overflow fittingsNot StartedYesOPEN
Coil C-4T-316QA Action TicketAdjust cooling tubes for coil to coil fitNot StartedOPEN
Coil C-4T-341Metrology (pre-measurement)Not StartedYesOPEN
Coil C-4T-359Grind overcastingNot StartedGrind additional areas noted in B1-C1 gross fitYesOPEN
Coil C-4T-377Add additional bolt holes (C-C)Not StartedYesOPEN
Coil C-4T-395Grinding/milling to accommodate nut accessNot StartedYesOPEN
Coil C-4T-450Not StartedAdd more fiducialsNot StartedWork Request submitted (N1150)/Inconel rod on orderYesOPEN
Coil C-4T-460Secure terminal lug hardwareNot StartedNeeds parts and weldingNoOPEN
Coil C-4T-479Correct clamp interference (#63, 65, 69, 71)Not StartedYesOPEN
Coil C-4T-511Install batt insulationNot StartedYesOPEN
Coil C-4T-548Fabricate BushingsNot StartedYesOPEN
Coil C-4T-591Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil C-5T-071ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil C-5T-123ECN 5140Cover entire lead area with cover/boxIn-ProgressTemporary plastic box installedNoOPEN
Coil C-5T-164Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil C-5T-182Install strain gauges- fiber opticNot StartedNeed design/Materials - awaiting Oak Ridge to finalizeYesOPEN
Coil C-5T-200Install thermocouples (coil areas)CompleteYesQA CHECK
Coil C-5T-272Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil C-5T-319QA Action TicketAdjust cooling tubes for coil to coil fitNot StartedYesOPEN
Coil C-5T-360Grind overcastingNot StartedGrind additional areas noted in B1-C1 gross fitYesOPEN
Coil C-5T-378Add additional bolt holes (C-C)Not StartedYesOPEN
Coil C-5T-396Grinding/milling to accommodate nut accessNot StartedYesOPEN
Coil C-5T-512Install batt insulationNot StartedYesOPEN
Coil C-5T-592Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
Coil C-6T-006NCR 3643Over stock castings- use gauge block and grind clearances as necessary (Type C coils)Not StartedTo be completed at shop when cutting new bolt holesYesOPEN
Coil C-6T-038ECN 5140Cut fingers of top chill platesIn-ProgressYesOPEN
Coil C-6T-051ECN 5140Replace chill plates in lead and poloidal break areas with G-11 spacersIn-ProgressYesOPEN
Coil C-6T-059ECN 5140In power bus tie in area- Install Kapton insulation over bolt to mitigate potentially short tracking pathIn-ProgressNoOPEN
Coil C-6T-072ECN 5140Install insulating washers on one side of the power bus connection to eliminate floating hardware [4]Not StartedNoOPEN
Coil C-6T-085ECN 5140Install a Kapton or thin G-11 sheet underneath the jumper stack to increase the tracking distanceIn-ProgressYesOPEN
Coil C-6T-093ECN 5140Install insulating plugs at bottom of the hole in the G-11 base plate to reduce the risk of the studs penetrating the G-11 backing plateIn-ProgressYesOPEN
Coil C-6T-106ECN 5140Electrically tie the three jumper studs to the bottom jumperNot StartedNoOPEN
Coil C-6T-124ECN 5140Cover entire lead area with cover/boxNot StartedNoOPEN
Coil C-6T-142ECN 5140Tie poloidal break shims & bolts electrically to the winding formNot StartedRequires wire and weldingNoOPEN
Coil C-6T-165Terminate cooling lines- braze fitting to tubes/ fill tube penetration holesNot StartedNoOPEN
Coil C-6T-183Install strain gauges- fiber opticNot StartedNeed design/Materials - awaiting Oak Ridge to finalizeYesOPEN
Coil C-6T-201Install thermocouples (coil areas)Not StartedYesOPEN
Coil C-6T-219NCR 3634/3639Modify final coil clamps- permeability & fitup issuesNot StartedYesOPEN
Coil C-6T-237Lock all clamp hardware- weld locking wireIn-ProgressYesOPEN
Coil C-6T-255Mount final co-wound diagnostic box to castingIn-ProgressYesOPEN
Coil C-6T-273Documentation package complete and ready for copyIn-ProgressYesOPEN
Coil C-6T-343Metrology (pre-measurement)Not StartedYesOPEN
Coil C-6T-361Grind overcastingNot StartedGrind additional areas noted in B1-C1 gross fitYesOPEN
Coil C-6T-379Add additional bolt holes (C-C)Not StartedYesOPEN
Coil C-6T-397Grinding/milling to accommodate nut accessIn-ProgressWork Request M1921YesOPEN
Coil C-6T-415Check thread engagement on tapped holesNot StartedYesOPEN
Coil C-6T-433Check threads (run bolt through) on tapped holesNot StartedYesOPEN
Coil C-6T-452Not StartedAdd more fiducialsNot StartedWork Request submitted (N1150)/Inconel rod on orderYesOPEN
Coil C-6T-462Secure terminal lug hardwareNot StartedNeeds parts and weldingNoOPEN
Coil C-6T-481Correct clamp interference (#63, 65, 69, 71)Not StartedYesOPEN
Coil C-6T-485Complete electrical tests following VPINot StartedYesOPEN
Coil C-6T-513Install batt insulationNot StartedYesOPEN
Coil C-6T-550Fabricate BushingsNot StartedYesOPEN
Coil C-6T-563Remove epoxy overflow fittingsNot StartedYesOPEN
Coil C-6T-593Electrical test (7.5 kV) following winding form re-workNot StartedYesOPEN
VVSA-1T-517A2 to B2 gross fit testNot StartedYesOPEN
VVSA-1T-518B2 to C2 gross fit testNot StartedYesOPEN
VVSA-2T-520A3 to B3 gross fit testNot StartedYesOPEN
VVSA-2T-521B3 to C3 gross fit testNot StartedYesOPEN
VVSA-2T-522A3 to A4 gross fit testNot StartedYesOPEN
VVSA-2T-523A4 to B4 gross fit testNot StartedYesOPEN
VVSA-2T-524B4 to C4 gross fit testNot StartedYesOPEN
VVSA-2T-525C4 to C6 gross fit testNot StartedYesOPEN
VVSA-3T-526A5 to B5 gross fit testNot StartedYesOPEN
VVSA-3T-527B5 to C6 gross fit testNot StartedYesOPEN
VVSA-3T-528A5 to A6 gross fit testNot StartedYesOPEN
VVSA-3T-529A6 to B6 gross fit testNot StartedYesOPEN
VVSA-3T-530B6 to C5 gross fit testNot StartedYesOPEN