From: Keilbach, Robert [Robert.Keilbach@wgint.com] Sent: Wednesday, February 01, 2006 8:33 PM To: Thomas G. Brown Subject: RE: Review SXR drawing Tom, Please note the following comments: Sheet 1 of 2: Note 1 should be revised to read as follows: Welding shall be performed in accordance with the requirements of ASME B31.3 and PPPL Procedure ENG-037. Visual weld inspection shall be performed in accordance with the acceptance criteria of ASME B31.3 Category D. Sheet 2 of 2: 1. Delete ...."or GMAW" - 3 places 2. Delete the circle "weld-all-around" symbol from the outside 1/8" intermittent fillet welds - 1 place. 3. The specified 1.5" length intermittent fillet welds at 45 degree intervals (8 total weld increments) are excessive for welding around a 3.5" diameter mounting cup. Please call me at 718 3588568 if there are any questions. Bob ________________________________ From: Thomas G. Brown [mailto:tbrown@pppl.gov] Sent: Wed 2/1/2006 9:33 AM To: Keilbach, Robert Subject: Review SXR drawing Bob, I've attached the soft X-ray diagnostic drawing for your weld inspection. The job charge is: 9450 3*** 3101 Thanks, Tom Tom Brown Princeton Plasma Physics Lab PO Box 451 Princeton, NJ 08543-0451 Phone: (609) 243-2156 fax: (609) 243-3030