From: Michael E. Viola Sent: Tuesday, May 16, 2006 8:40 AM To: Subrahmanya Ramakrishnan Cc: Thomas G. Brown; Erik D. Perry; William R. Blanchard; John C. Lacenere; Ronald L. Strykowsky Subject: RE: Electrical Load List - My email dated 04/20/06 new crane - one 50 HP motor hook; 15 HP for Bridge 3 HP for Trolley - all VFD controlled. AC Power is aware. receptacles for welding during construction receptacles for leak detectors and vacuum pumps receptacles for local lighting and instrumentation ground fault receptacles for vessel lighting, power tools, air recirculation, etc Thanks, Mike Viola, PPPL, (609) 243 3655 -----Original Message----- From: Subrahmanya Ramakrishnan Sent: Tuesday, May 16, 2006 9:33 AM To: William R. Blanchard; Arthur W. Brooks; Thomas G. Brown; James H. Chrzanowski; Mike Cole; Fred Dahlgren; Lawrence E. Dudek; Horng-Ming Fan; Charles A. Gentile; Geoffrey J. Gettelfinger; Paul Goranson; Phil Heitzenroeder; David W. Johnson; Michael R. Kalish; Bradley E. Nelson; Steve Raftopoulos; Timothy N. Stevenson; Michael E. Viola; David E. Williamson; Michael C. Zarnstorff Cc: Charles L. Neumeyer; Wayne T. Reiersen; Alfred von Halle; Mike Williams; Hutch Neilson; Ronald L. Strykowsky; Paul Sichta; Brentley C. Stratton; Erik D. Perry Subject: Electrical Load List - My email dated 04/20/06 REMINDER Hi So far I have received response only from WBS3, 5 & 7. This is to request others to give their inputs. Thanks Raki Hi Please forward to me the list of electrical loads in your WBS, needing electrical power. It may be noted that WBS4 is responsible to feed power up to the Power Panels. After the Power Panels the respective WBS manager has to budget the costs to connect the loads. Please call (x2191), if you have any questions. Include the loads for the initial phase of the project. How ever if you have already developed the load list for the final phase include the same with a note that they are not needed for the initial phase. Please use the attached spreadsheet for listing the loads. Thanks