From: Arthur W. Brooks Sent: Monday, December 17, 2007 2:23 PM To: Thomas G. Brown Subject: ProE Csys after Realignment Attachments: ProE_csys_after Realignment.xls Tom Attached are the new coordinate systems for the modular coils relative to CS0 following realignment. The realignment was done for each coil TYPE (ie A, B, C) targeting their own field errors. It also assumes the design installation order with C6 pairing with C1 (not C5 pairing with C1 as presently proposed). The C6 is wound and chill plates are being installed this week. I haven't got confirmation back from Jim yet but I hoping this works out. Art PS I hope you remember how we processed this data in ProE.