From: Michael J. Duco
Sent: Thursday, March 15, 2007 2:42 PM
To: Steve Raftopoulos; Thomas G. Brown; Arthur W. Brooks; Robert A. Ellis
Subject: A1 Coil B flange up

Attachments: 031507 A! BFLANGE UP DATA.IGS
Here is the Data from the B flange up scan. The Leapfrog scan went as well as the A flange up,ending up within .003" from the initial B flange lockin points. When the final leapfrog lockin was compared to the A flange up data points in Verisurf build, the greatest point deviation was .007"( only visible points were checked).
 
I then locked into the B flange using MTM's fiducials and saw lockin deviations of .001,.012 , .019 etc. again
 
Bob Ellis has all of the Alignment reports on a dongle
 
Mike