From: Michael J. Duco
Sent: Thursday, March 15, 2007 2:42
PM
To: Steve Raftopoulos; Thomas G. Brown; Arthur W. Brooks; Robert A.
Ellis
Subject: A1 Coil B flange up
Attachments: 031507
A! BFLANGE UP DATA.IGS
Here is the Data from the B flange up
scan. The Leapfrog scan went as well as the A flange up,ending up within
.003" from the initial B flange lockin points. When the final leapfrog
lockin was compared to the A flange up data points in Verisurf build, the
greatest point deviation was .007"( only visible points were
checked).
I then locked into the B flange using MTM's
fiducials and saw lockin deviations of .001,.012 , .019
etc. again
Bob Ellis has all of the Alignment reports on a
dongle
Mike