From: Arthur W. Brooks Sent: Friday, September 07, 2007 2:13 PM To: Thomas G. Brown Subject: Sling Load Fractions for HP assembly over VV Attachments: trace00_path5tom3r12right.xls; trace00_path5tom3r12left.xls Tom, I've added a worksheet to each of the assembly workbooks (left and right sides) showing the load fraction each sling carries at each step during assembly. The left side is the more severe with the first sling (inboard) carrying 65% of the load at the start of assembly (aka end of disassembly). Art