Performance assessment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Reference scenario |
Plasma performance |
S1 |
S2 |
S3 |
|
|
|
|
|
|
|
|
|
Kink stability |
|
|
|
|
|
|
|
|
|
|
|
|
Ballooning stability |
|
|
|
|
|
|
|
|
|
|
|
|
Mercier stability |
|
|
|
|
|
|
|
|
|
|
|
|
Tearing stability |
|
|
|
|
|
|
|
|
|
|
|
|
Surface quality |
|
|
|
|
|
|
|
|
|
|
|
|
Fast ion loss fraction |
|
|
|
|
|
|
|
|
|
|
|
|
Neoclassical confinement time |
|
|
|
|
|
|
|
|
|
|
|
|
ISS-95 confinement time |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Coil
data |
Number |
Length (m) |
|I|max (MAT) |
Turns |
ACu (cm2) |
|J|max (kA/cm2) |
J2t (1014 A2-s/m4) |
Ti
(K) |
Tf
(K) |
|
|
|
SC1 |
6 |
|
|
|
|
|
|
|
|
|
|
|
SC2 |
6 |
|
|
|
|
|
|
|
|
|
|
|
SC3 |
6 |
|
|
|
|
|
|
|
|
|
|
|
SC4 |
6 |
|
|
|
|
|
|
|
|
|
|
|
Total - saddle coils |
|
|
|
|
|
|
|
|
|
|
|
|
PF1 |
2 |
|
|
|
|
|
|
|
|
|
|
|
PF2 |
2 |
|
|
|
|
|
|
|
|
|
|
|
PF3 |
2 |
|
|
|
|
|
|
|
|
|
|
|
PF4 |
2 |
|
|
|
|
|
|
|
|
|
|
|
PF5 |
2 |
|
|
|
|
|
|
|
|
|
|
|
PF6 |
2 |
|
|
|
|
|
|
|
|
|
|
|
PF7 |
2 |
|
|
|
|
|
|
|
|
|
|
|
Total - PF coils |
|
|
|
|
|
|
|
|
|
|
|
|
TF |
18 |
|
|
|
|
|
|
|
|
|
|
|
Total - TF coils |
|
|
|
|
|
|
|
|
|
|
|
|
Grand Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Circuit data |
Imax (kA) |
Imin (kA) |
Vmax (kV) |
Vmin (kV) |
Parallel |
Series |
Total PS |
PW,max (MW) |
Pmax (MW) |
WW (MJ) |
Wmax (MJ) |
|
SC1 |
|
|
|
|
|
|
|
|
|
|
|
|
SC2 |
|
|
|
|
|
|
|
|
|
|
|
|
SC3 |
|
|
|
|
|
|
|
|
|
|
|
|
SC4 |
|
|
|
|
|
|
|
|
|
|
|
|
PF1 |
|
|
|
|
|
|
|
|
|
|
|
|
PF2 |
|
|
|
|
|
|
|
|
|
|
|
|
PF3 |
|
|
|
|
|
|
|
|
|
|
|
|
PF4 |
|
|
|
|
|
|
|
|
|
|
|
|
PF5 |
|
|
|
|
|
|
|
|
|
|
|
|
PF6 |
|
|
|
|
|
|
|
|
|
|
|
|
PF7 |
|
|
|
|
|
|
|
|
|
|
|
|
TF |
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Flexibility |
Compulsory flexibility requirements are TBD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Engineering
assessment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fabrication and |
|
|
|
Is a design concept defined? Has a credible way
of fabricating, |
|
|
|
assembly |
Components |
Assessment |
Risks |
assembling, and aligning components been
proposed? Biggest risks? |
|
|
|
VV and internal hardware |
? |
|
|
|
|
|
|
|
|
|
|
|
Conformal shell |
? |
|
|
|
|
|
|
|
|
|
|
|
Saddle coils |
? |
|
|
|
|
|
|
|
|
|
|
|
TF and PF coils |
? |
|
|
|
|
|
|
|
|
|
|
|
Machine structure |
? |
|
|
|
|
|
|
|
|
|
|
|
Features for alignment and
surface quality assessment |
? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Access |
Requirements |
Assessment |
Risks |
Adequate access been demonstrated? Biggest
risks? |
|
|
|
|
|
NBI |
? |
|
|
|
|
|
|
|
|
|
|
|
HHFW |
? |
|
|
|
|
|
|
|
|
|
|
|
Diagnostics |
? |
|
|
|
|
|
|
|
|
|
|
|
Vacuum pumping |
? |
|
|
|
|
|
|
|
|
|
|
|
Personnel access |
? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Stray
field at NBI |
Front |
|
|
|
|
|
|
|
|
|
|
|
|
Middle |
|
|
|
|
|
|
|
|
|
|
|
|
Back |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cost |
WBS Element |
Cost |
Risks |
|
|
|
|
|
|
|
|
|
1 |
Fusion Core Systems |
|
|
|
|
|
|
|
|
|
|
|
11 |
PFCs |
|
|
|
|
|
|
|
|
|
|
|
12 |
VV |
|
|
|
|
|
|
|
|
|
|
|
13 |
TF |
|
|
|
|
|
|
|
|
|
|
|
14 |
PFCs |
|
|
|
|
|
|
|
|
|
|
|
15 |
Cryostat |
|
|
|
|
|
|
|
|
|
|
|
16 |
Support structure |
|
|
|
|
|
|
|
|
|
|
|
17 |
Conformal coils |
|
|
|
|
|
|
|
|
|
|
|
2 |
Auxiliary Systems |
|
|
|
|
|
|
|
|
|
|
|
3 |
Diagnostics |
|
|
|
|
|
|
|
|
|
|
|
4 |
Electrical Power |
|
|
|
|
|
|
|
|
|
|
|
41 |
Site Power Systems |
|
|
|
|
|
|
|
|
|
|
|
42 |
Coil Power Systems |
|
|
|
|
|
|
|
|
|
|
|
5 |
Central I&C and Data
Acquisition |
|
|
|
|
|
|
|
|
|
|
|
6 |
Site and
Facilities |
|
|
|
|
|
|
|
|
|
|
|
61 |
Facility Modifications |
|
|
|
|
|
|
|
|
|
|
|
62 |
New buildings and
structures |
|
|
|
|
|
|
|
|
|
|
|
63 |
Water cooling |
|
|
|
|
|
|
|
|
|
|
|
64 |
Cryogenic cooling |
|
|
|
|
|
|
|
|
|
|
|
65 |
Waste handling and
treatment |
|
|
|
|
|
|
|
|
|
|
|
66 |
Utility systems |
|
|
|
|
|
|
|
|
|
|
|
67 |
Test cell and area
preparations |
|
|
|
|
|
|
|
|
|
|
|
7 |
Machine Assembly |
|
|
|
|
|
|
|
|
|
|
|
71 |
Pre-assembly operations |
|
|
|
|
|
|
|
|
|
|
|
72 |
Assembly in TC and basement |
|
|
|
|
|
|
|
|
|
|
|
73 |
Assembly tools and jigs |
|
|
|
|
|
|
|
|
|
|
|
74 |
Measurements systems |
|
|
|
|
|
|
|
|
|
|
|
8 |
Project Oversight and
Support |
|
|
|
|
|
|
|
|
|
|
|
9 |
Preparations
for Operation |
|
|
|
|
|
|
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|