•WBS 720 “On
Site Pre-Assembly Activities”
–The assembly of the VV/Coil Modules
will occur in the abandoned TFTR Test Cell located at D-site
•Area
Preparation: $57.6 k (720 mhrs technician and monthly
support)
–Sufficient floor
space and crane capacity available (110 Ton capacity)
–Manpower
dependent- Multiple segments could be assembled simultaneously
•