•Assemble
Field Period Components
–Assemble each of the three Field Periods
•TF coils/Modular coils/vacuum
vessel and Trim coils
•Slide TF/ Module coil assemblies onto
the vacuum vessel and align/fasten coil structures together
•Hang Vacuum vessel from Coil
support structure
•MIG weld port extensions to the
vacuum vessel