J.H. Chrzanowski
10
WBS 700 Machine Assembly
•
Assumptions
–
The vacuum vessel will be delivered to the
TFTR Test Cell in three sections
–
The TF coils and Modular coils will be
delivered to the TFTR Test Cell as separate
components