J.H. Chrzanowski
19
WBS 700 Machine Assembly
•Machine Assembly Sequence
–Install/align machine support columns
–Install lower support rings
–Install lower cryostat floor
–Position lower PF-3 & 4 coils in support Rings
–Pump down & Leak Check Vacuum Vessel
•