WBS 700 Machine Assembly
•
Machine Assembly Sequence
–
Install/align machine support columns
–
Install lower support rings
–
Install lower cryostat floor
–
Position lower PF-3 & 4 coils in support Rings
–
Pump down & Leak Check Vacuum Vessel
•