WBS 700 Machine Assembly
•Tooling Design and Material Procurements
–Special assembly and lifting fixtures and tooling
•$100.0 k ~ $125.0 k (w/25% G&A)
–General procurements ( miscellaneous items required for assembly- safety, tools, disposable items, etc.)
•$ 20.0 k ~ $ $25.0 k (w/25% G&A)
–Platform Materials