J.H. Chrzanowski
24
WBS 700 Machine Assembly
•
Machine Assembly Sequence- continued
–
Install Bus connections to coil systems
(WBS
400)
–
Connect Cryostat and water lines
(WBS 600)
–
Install Platform around machine
–
Install external diagnostics
(WBS 300)
•