NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Meeting Records
CY-2008 Meetings

Note:

Documentation is organized by meeting month and day.

 

The relevant WBS is in parentheses - (6) means WBS 6 in our shorthand notation.

(SIT) indicates a Systems Integration Team meeting.

(CS) indicates a monthly Cost and Schedule Review.

(WRD) indicates a Winding R&D meeting.

(Engr) indicates a project-wide Engineering meeting.

(Matl) indicates a materials test meeting.

(CA) indicates a Critical Activities status meeting

(PS) indicates the weekly Project Status telecon

(CCB) indicates a Change Control Board meeting

(TRC) indicates a meeting on the Twisted Racetrack Coil

Other entries are self-explanatory.

(OFES) indicates a meeting with OFES.

(FPA) indicates Field Period Assembly.

(DC) indicates Dimensional Control

(MC) indicates Modular Coil

(OSF) indicates On-site Fabrication

(ITF) indicates the Modular Coil Interface Task Force

(Weld) indicates a Weld Trials.

(PM) indicates weekly Project Manager meeting with entire project.

ORNL/PPPL Meeting

Records from IPT and Project meetings are posted on the Project Web.

January  02 (PM)  09 (PM) 16 (PM) 23 (PM)
February

06 (PM) 13 (PM) 20 (PM) 27 (PM)

March 05 (PM) 12 (PM) 19 (PM) 28 (PM)
April

04 (PM) 11 (PM) 17 (ORNL/PPPL)  18 (PM) 25 (PM) 30 (PM)

May 07 (PM) 14 (PM) 21 (PM) 27 (SIT) 28 (PM) 29 (Coil Protection) 29 (DC)
June

02 (SIT) 04 (PM) 10 (PM)

July  
August  
September  
October  
November  
December )
CY-2007 Meetings
CY-2006 Meetings
CY-2005 Meetings
CY-2004 Meetings
CY-2003 Meetings
CY-2002 Meetings
CY-2001 Meetings
CY-2000 Meetings

Privacy and Security Notice

Please forward comments and questions to the Webmaster